My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-1989 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1989
>
08-14-1989 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
7/22/2025 10:23:49 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
8/14/1989
Retention Effective Date
7/22/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o <br />CORCLUSIOHS, ORDER AND CONDITIONS <br />Based upon one or more of the findings noted above, the <br />Orono City Council hereby grants approval of the above referenced <br />variances to permit the relocation and construction of a <br />commercial structure of 4,500 square feet at the property known <br />as Windward Marine, Inc., and in addition, grants approval of the <br />commercial site plan based on plans drawn by Rutledge <br />Construction, Job #J 8060, revised date 6/14/89, subject to the <br />following conditions: <br />1. Prior to issuing a building permit for the commercial <br />structure and/or issuing a demolition permit for the razing <br />of the existing structure, the following must be completed <br />by the applicant: <br />a) Approval by the City Engineer of final grading and <br />drainage plans for the relocated parking area. <br />b) Applicant shall submit a Developer’s Agreement <br />with a Tietter of Credit written at 150% of the cost of <br />the required improvements to ensure the completion of <br />the landscaping and site Improvements required by the <br />City as a result of the upgrading of this property. <br />2. All green-space areas to be planted or restored per sice <br />plan by Rutledge Construction, Inc., revised date 8/3/89 - <br />entitled "Drainage Plan". This area includes the 5* buffer <br />along the north and south lot lines adjacent to the <br />residential and commercial properties, the former boat <br />launch area in the southwest corner of the property. <br />3. Payment of two SAC units at $1,100.00 ($550.00 per <br />current unit charge) with the building permit for the <br />construction of the commercial structure. <br />4. The 4,500 square foot commercial structure must be <br />provided with an automatic sprinkler system per State <br />Building Code, Appendix E. <br />5. Appropriate soil erosion control program shall be <br />maintained through the entire project and until permanent <br />erosion control is in effect. <br />6. Applicant shall provide six "year-round” parking stalls <br />within the proposed parking area to ensure adequate customer <br />parking tpace during winter boat storage months. <br />o <br />Page 4 of 7
The URL can be used to link to this page
Your browser does not support the video tag.