Laserfiche WebLink
Orono Garage Storage Trip Generation Review Page | 2 <br />For comparison purposes, the trip generation potential of a 128,000 SF light industrial building was investigated <br />as this would be the size and type of use that would be likely for this parcel. Table 2 summarizes the trip <br />generation estimates for a light industrial building per ITE’s Trip Generation Manual. <br />Table 2 - Trip Generation for Light Industrial <br />A general light industrial use for the site is estimated to generate over 100 peak hour trips and 623 daily trips. <br />In summary, the number of vehicle trips anticipated to be generated by the Proposed Project is extremely low, <br />approximately one new vehicle trip every 30 minutes during the peak hour, and impacts to existing traffic <br />operations will be minimal. If the site were to be developed into a light industrial building the trip generation <br />potential increases to over 100 trips for the peak hours and 623 daily trips. <br />Please contact Katie Schmidt at katie@s2traffic.com with any questions. <br />Figure 2. Site Plan <br />Trips Generated: <br />Enter Exit Enter Exit <br />General Light Industrial 110 128,000 s.f.101 15 18 84 623 <br />101 15 18 84 <br />102Totals 116 623 <br />PM Peak Weekday <br />ADT <br />Land Use ITE Land <br />Use Code Size AM Peak <br />111