Laserfiche WebLink
C 13.0 Lighting Plan <br />C14.0 Orono Industrial Blvd Plan and Profile <br />C 15.0-C 15.1 Civil Details <br />9. DESIGN STANDARDS. <br />A. The Developer received Conditional Use Permit approval for a portion of <br />the property to be known as Lot 1, Block 1, Crystal Bay Business Center to allow the building on <br />this lot to have 50% to 60% burnished block and 40% to 50% rock face block as alternative <br />materials. <br />B. The Developer received variance approval on September 11, 2006, for a <br />narrower street right of way than required by City standards. The right of way for the new street <br />is to be 60 feet wide whereas the subdivision regulations would require a 70 foot wide right of <br />way. The street shall be named "Orono industrial Boulevard." Work to be performed on Orono <br />Industrial Boulevard, Old Crystal Bay Road, and the ditch upgrade and improvements along <br />Highway 12 shall be completed before a shell Certificate of Occupancy is issued for Lot 1, Block <br />1, or Lot 1, Block 2. Work to be performed on Old Crystal Bay Road and the ditch upgrade and <br />improvements along Highway 12 shall be completed before a shell Certificate of Occupancy is <br />issued for Lot 2, Block 2. <br />10. PERMITS. The Developer shall obtain or require its contractors and <br />subcontractors to obtain any necessary permits, which may include: <br />• Hennepin County for County Road Access and Work in County Rights -of - <br />Way <br />• MnDot for State Highway Access <br />• Minnesota Department of Health for Watermains <br />• NPDES Permit for Storrnwater Connections <br />• MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal <br />• DNR for Dewatering <br />• City of Orono for Building Permits <br />• Minnehaha Creek Watershed District <br />132281 ill <br />-7- <br />126 <br />