My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-09-2025 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
2025
>
06-09-2025 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:56:59 AM
Creation date
6/6/2025 2:07:57 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
6/9/2025
Retention Effective Date
6/9/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Relocation of Wayzata Boulevard Access and <br />reconstruction of the paved areas on Lot 3, Block 2 <br />The Private Improvements shall be installed in accordance with the City <br />Ordinances; City standard specifications for utilities and street construction, and MNDOT <br />specifications. The Developer shall submit plans and specifications which have been prepared <br />by a competent registered professional engineer or other appropriate professional to the City for <br />approval by the City Engineer. The Private Improvements with respect to each Lot shall be <br />installed in conjunction with the construction or remodeling of a building or buildings within <br />each Lot. <br />8. DEVELOPMENT PLANS. The Plat shall be developed in accordance with the <br />conditions set forth in the Resolution approving the Plat and the following plans, all dated as of <br />October 26, 2007 ("Plans") which are incorporated herein by reference. With the exception of <br />Plans C3.0 and C5.0, the Plans may be finalized, subject to approval by the City Engineer, after <br />the date of the Agreement, but before issuance of an individual building permit for any Lot. The <br />Plans shall not be attached to this Agreement. If the Plans vary from the written terms of this <br />Agreement, the written terms shall control. The Plans are: <br />PLANS <br />C 1.0 Title Sheet <br />C2.0 ALTAIACSM Land Title Survey (As Prepared by Westwood Professional Services) <br />C3.0 Final Plat <br />C4.0 Existing Conditions and Removals Plan <br />C5.0 Master Site Plan <br />C6.0 Site Plan <br />C7.0 Grading and Drainage Plan <br />C8.0 Stormwater Pollution Prevention Plan (S WPPP) <br />C8.1 S WPPP Notes and Details <br />C9.0 Storm Sewer Plan <br />C10.0 Utility Plan <br />C11.0 Landscape Plan <br />C 12.0 Landscape Details <br />132281 v11 <br />M <br />125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.