My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-01-21 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Cristofori Circle
>
165 Cristofori Circle - 31-118-23-43-0014
>
Septic
>
1996-01-21 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 3:50:16 PM
Creation date
5/22/2025 3:44:26 PM
Metadata
Fields
Template:
x Address Old
House Number
165
Street Name
Cristofori
Street Type
Circle
Address
165 Cristofori Circle
PIN
3111823430014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- S-P TESTING, INC. Steven B. Schirmers - MPCA Cert.No. 627 <br />951 Katydid Lane NE - §L Michael,- MN -5537-6 • (612) 497-3566 <br />r <br />S <br />January 21, 1996 �Lk <br />Keith Waters & Associates <br />Lessor Residence <br />Lot 1, Block 3 <br />Cristofori Woods Addition <br />Orono, Henn. Co., MN <br />This on -Site Sewage Treatment System is Designed for a Type 1, five bedroom home <br />designed in accordance with the Minnesota Pollution Control Agency Chapter 7080 and <br />local ordinances. <br />The soils on this site are a clay loam. The seasonally saturated soils were located at <br />18" - 24". Due to the seasonally saturated soils, a Pressurized Mound System V-11 need <br />to be installed to treat septic effluent. The bottom of the treatment area must be located <br />at least 3' above the saturated soils. <br />The soils at a depth of 12" have a percolation rate averaging 4.8 mpi. <br />A pumping chamber will need to be installed to lift the effluent to the treatment area. <br />The power supply and switches must be located outside the manhole and pumping <br />chamber in a weather proof enclosure. A warning device must be installed with a light <br />and sound deice, this is in case of a pump failure. <br />The manifold and supply line pipe must h - drainage to the pumping chamber. <br />The distribution pipes shall have their enc. G. Be sure the rock and sand fill <br />material are clean. The sod layer below th.- _ ore mounded area must be turned over, <br />just break up the sod, be sure not to over work. <br />All neighboring wells are located greater than 100' away from the proposed treatment <br />area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.