My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-01-21 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Cristofori Circle
>
165 Cristofori Circle - 31-118-23-43-0014
>
Septic
>
1996-01-21 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 3:50:16 PM
Creation date
5/22/2025 3:44:26 PM
Metadata
Fields
Template:
x Address Old
House Number
165
Street Name
Cristofori
Street Type
Circle
Address
165 Cristofori Circle
PIN
3111823430014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO <br />SEPTIC SYSTEM APPROVAL <br />CITY of ORONO <br />ty ✓' Muadcipst Offices <br />Past Office Box 66 <br />cr) sW Day, hUmmets 59230066 <br />�9kESKD¢4, <br />LOCATION: 165 Cristofori Cir. <br />OWNER: <br />GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br />SITE EVALUATOR: s-P Testing REPORT DATE: January 21, 1996 <br />The City of Orono has <br />approved <br />(approved -disapproved) <br />with the following comments: <br />your on -site system design as of June 26, 1996 <br />(date) <br />THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br />be issued to a licensed septic contractor prier to installation. A list of currently licensed septic contractors is <br />enclosed. <br />NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br />Inspector (473-7357). Call for inspections 24 hours in advance. <br />ALL DRAIN FIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br />in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br />has verified that primary and alternate sites are adequately protected. <br />NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br />of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br />unusable prohibiting the timely completion and or limiting the long term use of the property. <br />A site copy will be available at the City Offices for the septic contractor. <br />CLTY O OCRO� <br />ByStephe e, On -site Systems Manager <br />TELEPHONE - 473-73V • FAX - 4734510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.