My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-10-1989 Council Packet
Orono
>
City Council
>
1989
>
07-10-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2025 4:35:35 PM
Creation date
5/6/2025 4:30:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
but are shown on the Preliminary Development Plan last <br />revised January 24, 1989. <br />F. The applicant has created a no-grading <br />sone/woodlands protection area within the rrivate open <br />space outlets (namely Outlets A and B) and the setback <br />areas defined within each building lot. Within those <br />areas no future owner will be allowed to remove trees in <br />excess of 2 inches in diameter at four feet above grade. <br />No grading is allowed within the protected areas. <br />However, each residential lot may include one driveway up <br />to 20 feet wide leading to the loop road. This driveway <br />may be graded and trees of any size may be removed to <br />build it. The Subdivider's Agreement should also define <br />the protected areas such as the setback area of each lot <br />and the private open space outlots. <br />G. Each building pad (defined by the setbacks for <br />each lot) is limited to 80% hardcover improvements as <br />defined in the declaration covenants. Such improvements <br />will include the access road through the portion of the <br />property located within the front street setback area. <br />H. In a preliminary report, the City Engineer Glenn <br />Cook has confirmed that there is adequate sewer capacity <br />either through Long Lake by the Joint Powers Agreement or <br />by constructing a new interceptor along the Highway 12 <br />Corridor. <br />-5-
The URL can be used to link to this page
Your browser does not support the video tag.