My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-10-1989 Council Packet
Orono
>
City Council
>
1989
>
07-10-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2025 4:35:35 PM
Creation date
5/6/2025 4:30:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Subdivider through his engineer shall provide for <br />competent daily inspection of all Plan A Improvements, both public <br />and private. Inspection rep« 't copies shall be provided by the <br />Subdivider's engineei to the City Engineer on a weekly basis. <br />As-built drawings with service and valve ties on reproducible mylar <br />and certifications by the Subdivider's engineer of completion and <br />compliance with specifications approved by the City shall also be <br />delivered to the City in the form and C' :.»• approved by the City <br />and shall be approved by the City Engine*tfr. <br />C. Construction of Plan A Tmprnv«yMints. <br />(1) Completion Date, All Plan A Improvements shall <br />be completed not later than as shown on Exhibit E. <br />(2) Approval of Contractors. Any contractor <br />selected by the Subdivider to construct and install any Plan A <br />Improvement must be determined in writing by the City Engineer to <br />be acceptable. The City reserves the right to require satisfactory <br />proof of successful cicperience and adequate financial status of any <br />such contractor. Where required by City ordinances, the contractor <br />shall first obtain a license from the City. <br />(3) Pre-Construction Conference. Prior to any <br />construction work on the Subdivision, the Subdivider, Subdivider's <br />contractor and engineer, shall meet with the Cit^ Engineer to <br />review the proposed work schedule. <br />(4) Construction, The construction, installation <br />and materials shall be in accordance with the plans ai. ^ <br />-4-
The URL can be used to link to this page
Your browser does not support the video tag.