Laserfiche WebLink
Matt Dolecki <br />Phone: 763-425-0575 <br />Cell: 612-834-0168 <br />Email: m.dolecki@alliedblacktopmn.com <br />Date: <br />City of Orono 2025 Crack Seal <br />2700 Kelley Pkwy <br />Orono, MN 55356 <br />Contact Person:Brent Weldon Brent Weldon <br />Phone:952-249-4670 Phone:952-249-4670 <br />Email:bweldon@ci.orono.mn.us Email:bweldon@ci.orono.mn.us <br />Unit Qty.Unit Price Price INT <br />Crack Sealing: LS 1 $22,050.00 $22,050.00 <br />NOTE: Irrigation must be off 24 Hrs and obstructions moved prior to construction. Additional <br />MOB charges may apply. Paper cover will be used at the discretion of the contractor. <br />Note: Contracted prices are subject to re-pricing if the WTI oil pricing exceeds $125/Barrel at time of delivery <br />We propose to furnish material and labor, complete in accordance with the above specifications, for the total lump sum of: <br />Note: This proposal may be withdrawn if not accepted within 15 days. Any alteration or deviation from the above specifications involving extra costs will be executed only upon written <br />Acceptance of Proposal: The above prices, specifications, conditions, and attached warranty qualifications are satisfactory and are hereby <br />accepted. You are authorized to do the work as specified. Payment will be made as outlined above. <br />Date of Acceptance:Signature: <br />Payment terms are net 30 days. Payment terms for chip seal applications are 90% due net 30 days, balance due upon completion of sweeping. <br />orders, and will become an extra charge over and above the estimate. All agreements are contingent upon strikes, accidents, weather or other delays beyond our control. <br />Allied Inc. to carry proper insurance including Workers Compensation. <br />Authorized Signature:Matt Dolecki <br />Matt Dolecki <br />Exclusions: Bonds, permits, fees, surveying, engineering, testing, rail road insurance, special insurance, site specific training for employees, landscaping, irrigation, watering of sod, soil corrections, dewatering, <br />traffic control, utility or structural sheeting, shoring, underpinning, buried debris, rock excavation, class V base materials, drain tile, footing insulation or waterproofing, separation fabrics, vapor barriers, drainage <br />layers, hazardous materials, removal of contaminated soils, haul road construction, erosion control, site restoration, gas, mechanical, or electrical excavation, site fencing, locating private utilities, <br />private utility repairs, winter or cold weather conditions, night or weekend work, winter conditions. <br />Note: See Allied Blacktop Warranty Terms, Qualifications, and Construction Specifications. <br />ADD 1% Bonding if Necessary <br />TOTAL ALL:$22,050.00 <br />Alligator cracking, hairline cracking, block cracking, or cracks wider than 1" are not <br />included unless otherwise specified. Previously filled cracks will not be routed. <br />Rout and seal longitudinal and transverse working cracks that are 1/4" wide or wider. <br />NOTE: Quote Assumes 1 mobilization <br />We hereby submit specifications and quotations for the following: <br />Description of Work to be Performed <br />www.alliedblacktopmn.com <br />Proposal <br />April 7, 2025 <br />10503 - 89th Avenue North <br />Maple Grove, MN 55369 <br />Project Name: <br />Billing Address: <br />Company Name: <br />Project Contact Person: <br />Project Address: <br />45