My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-28-2025 - Agenda Packet CC - regular meeting
Orono
>
City Council
>
2025
>
04-28-2025 - Agenda Packet CC - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:46 AM
Creation date
4/28/2025 8:42:22 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
4/28/2025
Retention Effective Date
4/28/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
any obstructions (vehicles, dumpsters, etc) at the scheduled project start date and time. <br />MP Asphalt Maintenance reserves the right to adjust the agreed upon project price if the <br />job conditions prevent MP Asphalt Maintenance work crews from starting on time and <br />proceeding without interruption. <br />CLEANING EXPENSES: The owner understands that the work called for in this agreement is a <br />messy process. The parties agree that MP Asphalt Maintenance is not responsible for <br />cleaning, repairing, or replacing any concrete, carpet, floor, passageway, etc., that is <br />soiled or stained by anyone other than MP Asphalt Maintenance employees. Sprinkler <br />systems must be off 24 hrs. before and after. Bluing of sealer may accrue and is normal. it <br />does not affect craftsmanship, warranty, or longevity. <br />INDEMNITY:MP Asphalt Maintenance agrees to complete its work in a safe and workmanlike <br />manner, and to take appropriate safety precautions. However, once installation is <br />complete and customer takes possession of the work area, Owner/Customer understands <br />and agrees that MP Asphalt Maintenance cannot be responsible for materials, area <br />maintenance and safety, and therefore Owner/Customer assumes all responsibility in this <br />regard, including but not limited to any and all personal injuries, deaths, property damage, <br />losses, or expenses related to or in any way connected with the materials or services <br />provided. To the fullest extent allowed by law, Owner/Customer agrees to indemnify, <br />defend and hold MP Asphalt Maintenance and its agents harmless from all loss, expense, <br />liability, or attorneys' fees in connection with any such damages or injuries occurring <br />thereafter. Nothing contained within this paragraph means or should be construed to mean <br />that MP Asphalt Maintenance or others shall be indemnified for their own negligence. <br />CHOICE OF LAW & VENUE: To the fullest extent permitted by law, each provision of this <br />contract shall be interpreted in such a manner as to be effective and valid under <br />Minnesota law without regard to its conflict of laws principles. To the fullest extent <br />permitted by law. <br />ATTORNEY FEES & COSTS: In the event MP Asphalt Maintenance places any amounts owed <br />under this proposal for collection with either a collection firm or attorney, MP Asphalt <br />Maintenance shall be entitled to reasonable collection fees, attorney's fees and costs. <br />TAXES: All taxes are included in the proposal price unless otherwise specified. <br />ESCALATION CLAUSE: This contract has been based on material costs at current market rates. <br />Due to uncertain market conditions that are beyond our control and in the event of future <br />material price increases, the party responsible agrees to pay for the escalations of material <br />without a charge order. This paragraph applies only to materials. <br />TIMING: Due to fluctuation in the cost of raw materials, if the current date is 15 days past the <br />proposal date, the customer should clarify that pricing is still valid. <br />MATERIAL & WORKMANSHIP: All material is guaranteed to be as specified. Unless otherwise <br />specified within this Proposal, MP Asphalt Maintenance warranties workmanship and <br />materials for a period of 6 months from the date of completion. All driveways and overlays <br />may experience cracking throughout the 1st winter and do not result in a warranty claim. <br />All work shall be completed in a workmanlike manner according to standard practices. Any <br />alteration or deviation from the above specifications involving extra cost will be executed <br />only upon written orders and will become an extra charge over and above the amount set <br />forth above. We shall not be responsible for delays caused by strikes, accidents, weather <br />or other contingencies beyond our control. Our workers are fully insured <br />NON-DISCLOSURE: Customer acknowledges that information in this Proposal, including but not <br />limited to pricing, determination of scope of work, method for evaluating parking lots, and <br />methods of repair, constitute and include Confide MP Asphalt Maintenance Information. <br />43
The URL can be used to link to this page
Your browser does not support the video tag.