Laserfiche WebLink
Development Fees: <br />The submitted plans reflected each individual building provided with individual connections for City <br />sewer and water with each unit being metered individually. A Sewer Availability Charge (“SAC”) <br />determination by the Metropolitan Council (Met Council) is required in order to calculate the <br />appropriate fees for sewer services. Staff is recommending to use the Met Council’s unit determination <br />to calculate the City’s water and sewer area connection charge. The applicant is requesting these fees <br />be due at time of building permit for each building. Typically, these fees are due at time of final plat, <br />because this is an industrial development and proposed as a phase project staff can accommodate <br />applying these fees with the building permit. <br />At this time, due to the size of the buildings and the number/type of proposed connections it is <br />estimated that the development will require 14 SAC units according to the Met Council. Therefore, City <br />will calculate the water and sewer area charges for 14 units. Each individual condo or suite will need its <br />own water meter. A utility connection permit will be due at the time of building permit issuance for <br />each unit that will be metered as well. <br />PROPOSED DEVELOPMENT FEE ANALYSIS: <br />Fee Type Breakdown Estimated Total <br />Water Area Connection $4,370.00 x 14 units $61,180.00 <br />Water Connection Permit Fee $150.00 x 85 suites**$12,750.00 + meter costs <br />Sewer Area Connection $6,000.00 x 14 units $84,000.00 <br />Sewer Connection Permit Fee $150.00 x 85 Suites**$12.750.00 + meter costs <br />Sewer Availability Charge “SAC” <br />(Met Council) <br />$2,485.00 x 14 units*$34,790.00* <br />Stormwater Drainage Trunk Fee $9,690.00 x 4.89 acres $47,384.10 <br />ESTIMATED DEVELOPMENT FEES = $ 252,854.10 <br />*A SAC determination is required by the Met Council and may alter this fee. <br />102