My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-28-2025 - Agenda Packet CC - regular meeting
Orono
>
City Council
>
2025
>
04-28-2025 - Agenda Packet CC - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:46 AM
Creation date
4/28/2025 8:42:22 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
4/28/2025
Retention Effective Date
4/28/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Development Fees: <br />The submitted plans reflected each individual building provided with individual connections for City <br />sewer and water with each unit being metered individually. A Sewer Availability Charge (“SAC”) <br />determination by the Metropolitan Council (Met Council) is required in order to calculate the <br />appropriate fees for sewer services. Staff is recommending to use the Met Council’s unit determination <br />to calculate the City’s water and sewer area connection charge. The applicant is requesting these fees <br />be due at time of building permit for each building. Typically, these fees are due at time of final plat, <br />because this is an industrial development and proposed as a phase project staff can accommodate <br />applying these fees with the building permit. <br />At this time, due to the size of the buildings and the number/type of proposed connections it is <br />estimated that the development will require 14 SAC units according to the Met Council. Therefore, City <br />will calculate the water and sewer area charges for 14 units. Each individual condo or suite will need its <br />own water meter. A utility connection permit will be due at the time of building permit issuance for <br />each unit that will be metered as well. <br />PROPOSED DEVELOPMENT FEE ANALYSIS: <br />Fee Type Breakdown Estimated Total <br />Water Area Connection $4,370.00 x 14 units $61,180.00 <br />Water Connection Permit Fee $150.00 x 85 suites**$12,750.00 + meter costs <br />Sewer Area Connection $6,000.00 x 14 units $84,000.00 <br />Sewer Connection Permit Fee $150.00 x 85 Suites**$12.750.00 + meter costs <br />Sewer Availability Charge “SAC” <br />(Met Council) <br />$2,485.00 x 14 units*$34,790.00* <br />Stormwater Drainage Trunk Fee $9,690.00 x 4.89 acres $47,384.10 <br />ESTIMATED DEVELOPMENT FEES = $ 252,854.10 <br />*A SAC determination is required by the Met Council and may alter this fee. <br />102
The URL can be used to link to this page
Your browser does not support the video tag.