My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-1989 Council Packet
Orono
>
City Council
>
1950-2024
>
1980-1989 Microfilm
>
1989
>
06-12-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 12:56:58 PM
Creation date
4/21/2025 12:51:29 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. The applicants shall grant the standards underlying road <br />and utility easements for Outlots A and B, to be filed with <br />the plat. <br />3. Lot 2 shall gain public access via a private driveway <br />onto Outlot A and the existing private easement roadway <br />leading to North Ferndale Road. Any proposed driveway <br />access point for either Lots 1 or 2 shall be subject to the <br />approval of the Public Works Director. <br />4. A variance will be granted for Lots 1 and 2 which do not <br />front on a public roadway as required. Also, a variance <br />will be granted for lot width for Lot 2, to allow a 60* <br />defined lot width where a 200* lot width is normally <br />required. <br />5. Standard drainage and utility easements shall be shown <br />on the plat along lot lines, being 10* in width along <br />perimeter lot lines and 5* in width along interior lot <br />lines. <br />6. Applicant shall construct the detention basin per the <br />Citi Engineer*s approval as a first condition to issuance of <br />a building permit for a house on the property. This basin <br />shall be completed at the time of initial foundation <br />excavation on the property, and shall be approved by the <br />City Engineer prior to construction of footings for the <br />proposed residence. Proper erosion controls shall be <br />maintained in place during construction of the detention <br />basin. All disturbed areas snail be seeded or sodded <br />immediately after completion of the detention basin. <br />7. A drainage easement shall be dedicated over the <br />boundaries of the detention basin to be constructed within <br />Lots 1 and 2. The boundaries of this easement shall be <br />shown on the plat drawings as a drainage easement. <br />8. Payment of standard park fees of $200.00 for Lot 2 and <br />$100.00 for Lot 1. At such future time that Lot 1 is <br />further subdivided, credit for previously paid park fee <br />shall be granted per the provisions of the City of Orono <br />ordinances. <br />Page 3 of 5
The URL can be used to link to this page
Your browser does not support the video tag.