Laserfiche WebLink
D <br />j <br />“1 <br />j <br />J <br />1 <br />3 <br />3 <br />3 <br />300 <br />170 <br />7 <br />1 <br />Lin.ft. <br />Lin.ft. <br />Each <br />Each <br />LUMP SUH <br />2,000 Sq.yds <br />80 Sq.yds <br />APPENDIX <br />COST ESTIMATE <br />NAVARRE HEIGHTS STORM SEVER IMPROVEMENT <br />ORONO, MINNESOTA <br />15* RCP % $20.00/Lin.ft. <br />18" RCP 8 $25.00/Lin.ft. <br />Catch basin | $800.00/Each <br />18" RCP apron § S*<no. 00/Each <br />Tree removal % $500.00 <br />Sod 8 $3.00/Sq.yds. <br />Street replacement 8 $15.00/Sq.yds. <br />5Z Contingencies <br />Total Constructio.i <br />152 Legal, Engmg., Admin. & Bond Interest <br />52 Bonding & Capitalize Interest <br />Total Project Cost <br />$ 6,000.00 <br />4.250.00 <br />5.600.00 <br />300.00 <br />500.00 <br />6,000.00 <br />1.200.00 <br />$23,850.00 <br />1.200.00 <br />$25,050.00 <br />3.750.00 <br />$28,800.00 <br />1.450.00 <br />$30,250.00 <br />3 <br />RPT13946 <br />- 6 -