Laserfiche WebLink
The property owners should also rip rap the shore line along the entire <br />length. This will help stabilize the shore line and prevent undercutting of <br />the bank. The planting of shrubs and bushes should also be required under <br />either option. <br />There are four significant Items that should be determined prior to proceeding <br />with the project design and construction: <br />1. Should an exposed vail along a portion of the area be allowed? <br />2. Should the wall be extended as requested by the property owners? <br />3. Vhat will be required for easements to allow for construction of the wall? <br />A. How will the project be funded? <br />If you have any questions, please contact this office. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />Glenn R. Cr>ok <br />GRCtll <br />Page 2.