My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-1989 Council Packet
Orono
>
City Council
>
1989
>
04-10-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 9:31:14 AM
Creation date
4/1/2025 2:01:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #1386 <br />April 6, 1989 <br />Page 8 of 9 <br />Staff can proceed to work with the applicant on the preparation of the <br />general concept stage under the PUD zoning (providing even a credit against <br />the rezoning fee from Application #1386). The PD rezoning fee has not been <br />listed in the fee ordinance of the Cityr but will be as soon as the <br />ordinance is adopted. Subdivision and commercial site plan fees are <br />already established. The following issues must be resolved before Mr. <br />Otten can present a comprehensive PD rezoning application: <br />1. The City to resolve MnDot's request for additional right-of-way <br />for Highway 12 safety improvements and impact on proposal, <br />2. Impact, if any, on property as a result of County Road 116 <br />extension to Highway 12. <br />3. Extent of area needed for future semaphore at Willow Drive and <br />Highway 12 intersection and impact on site. <br />4. Need for new controlled access off of Highway 12 - temporary vs, <br />permanent. <br />5. Resolve of wetland classification and current boundaries <br />(Conservation & Flowage Easement exists over wetlands). <br />6. Prepare preliminary grading and drainage plans for application <br />with M.C.W.D. and review by City Engineer. <br />7. Define portion of east/west road to be completed as part of <br />development of most western lot of the proposed division, <br />8. Final resoJve of location of east/west road as it intersects the <br />Otten property. <br />9. City to determine need for municipal water to site. <br />10. Schedule for sewering of property - currently under consideration <br />for Rebers' property. <br />11. City to determine need for additional curb cuts on Willow Drive - <br />applicant's concept proposal shows a separate curb cut from east/west <br />access road.
The URL can be used to link to this page
Your browser does not support the video tag.