Laserfiche WebLink
Project lA - SE picnic building construction <br />Project IB - PD picnic building construction <br />Project 1C - visitor center renovation - foundation and other re­ <br />novation - major on-going project <br />Project 10 - PO latrine/ nower buildir? construction <br />building and septic field for 4s and manager's cabin <br />Project IE - SE latrine/shower building construction <br />building and septic field for 4s + 10-12 cabins <br />Project IF - NE picnic building construction <br />Project IG - NE latrine/shower building construction <br />building and septic field (tent camping area) <br />Project IH - storage building renovation - limited renovation of <br />storage buildings to repair and improve security <br />Project II - NW picnic building <br />Phase 2 - Handicapped Accessible Cabin Construction <br />This phase provides for the construction of ten handicapped accessible <br />cabins in the SE area. Each cabin will be connected to the septic <br />systems installed in project IE. Refer to attachment for drawing and <br />floor plan. <br />Project 2A - cabin #1 <br />Project 2B - cabin #2 <br />Project 2C - cabin #3 <br />Project 2D - cabin #4 <br />Project 2E - cabin #5 <br />Project 2F - cabin tfS <br />Project 26 - cabin §7 <br />Project 2H - cabin #8 <br />Project 21 - cabin #9 <br />Project 2J - cabin #10 <br />Project 2K - handicapped ramp and trail construction <br />improvement of existing hard-surfaced trails and building <br />of sidew^ between cabins and to oeach