Laserfiche WebLink
Operational Evolution <br />The renovation and reconstruction of the Camp will proceed in three general <br />phases: <br />Phase 1 - Day and overnight tent camping facilities <br />Phase 2 - Handicapped accessible cabin construction <br />Phase 3 - Operational enhancement <br />Some projects within a given phase may overlap another phase; however, the <br />Overall strategy is an orderly evolution of operational capabilities. <br />Reconstruction and Renovation Sites <br />1. Southeast (SE) - Point Charming Area <br />2. Northeast (NE) - East of Peanut Row Area <br />includes Peanut Row latrine site <br />3. North and Central (NC) - Includes all existing buildings other <br />than Peanut Row and Point Charming <br />latrines <br />4. Playground and Dock’-(PO) - Area immediately west and southwest <br />of main pavi1 ion <br />5. Northwest (NW) - Area northwest and west of playground <br />(See attached map #1) <br />Overall Concept <br />Construct new picnic buildings and latrine/shower buildings to <br />support day and overnight tent camping use. Renovate old main dining hall <br />for use as a visitor's center and repair other existing storage buildings <br />and caretaker's cabin as necessary. Construct 10-12 handicapped accessible <br />cabins at SE location. Expand services and buildings in NE and NW areas if <br />required for additional day, tent or cabin use. <br />Phase One - Scope and Projects <br />Phase 1 - Day and overnight tent camping facilities <br />This fiise provides for the erection of four picnic and <br />three latrine and shower buildings with new septic tanks and fields, and <br />renovation of existing buildings.