Laserfiche WebLink
SEC. 10 •SPECIAL REQUZREMEIITS FOR REZONIEG IN THE HIGHWAY 12 CCRRirOR STUDY AREA. <br />A.Minimum Area <br />To insure consistency with the goals atnd objectives of the <br />Highway 12 Corridor Study, applications for rezoning <br />within the study area must include a mininum of five <br />acres. The plans submitted along with these applications <br />must also include enough information regarding the effect <br />of the proposed development on surrounding parcels to <br />insure that the property can be developed in a manner that <br />is both compatible with adjacent properties and consistent <br />with the Highway 12 Corridor Study. <br />B.Access and Circulation Plan <br />The plans submitted along with the application must <br />propose access to the proposed development which is <br />consistent with the Transportation Planning Objectives of <br />the Highway 12 Corridor Study. All public easements and <br />road right of way that is needed to allow the construction <br />of service roads and/or the expansion of Trunk Highway 12 <br />past the subject property, shall be dedicated to the <br />City. <br />c. Sanitary Sewer Availability <br />The available sanitary sewer capacity to serve vhe <br />development of this corridor is currently very limited. <br />Therefore, any plans to develop within this arei must <br />either demonstrate that it can occur utilizing current <br />sewer allocations or they must include improvements to <br />increase the capacity of the systems serving area. <br />If sanitary sewer system improvements are propojed as part <br />of the application, then the feasibility of pro iding thiat <br />service will also be scratinized along with an mprovement <br />financing plan to insure that the costs associated with <br />providing this additional capacity will be paid for by the <br />development. <br />0.Storm Water Management <br />Site Drainage plans must be submitted to insure <br />consistency with the storm water management objectives of <br />the Highway 12 Corridor Study. Plans will be carefully