My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-27-1989 Council Packet
Orono
>
City Council
>
1989
>
02-27-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:00:47 AM
Creation date
3/21/2025 9:57:54 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/jrrAaUiv\€jrr^ ^ > III- IMPLZMBHTATIOH ABD CHAH62 <br />1. INTRODOCTION <br />This docuflisnt represants the summary of the study phase <br />I . ^ <br />giving the background, considerations, and conclusions for the <br />nXteration of land use patterns in the Highway 12 corridor. This <br />docuaent, submitted as part of the comprehensive plan amendment <br />to the Metropolitan Council# has been reviewed at a publttc <br />hearing held before the Planning Commission and by the City <br />Council. The review of this comprehensive plan amendment is in <br />addition to the nine meetings that were held during the study <br />phase. During the Metropolitan CounciJ s review of this plan, <br />the City will be working to develop the appropriate zoning <br />implementation tools for this amendment. Implementation tools <br />will break down into two groups. The first group is the <br />standards which will have to be satisfied prior to a property <br />being rezoned. / The second set will be the actual zoning ^ <br />standards. • Some will be new and others will be revisions of the <br />existing Planned Unit Development (PDO), zqning standards <br />incorporated within current ordinances. <br />Dpon review and subsequent approval by tne Metropolitan <br />Council, the cosiprehensive plan amendment will be brought back <br />for formal adoption by the City Council. At that time the zoning <br />4ia^ix^aoiita will, be considered and adapted to allow for <br />imploMntation of the comprehensive plan amendment. At the same <br />^4mm the allocation of existing sewer units currently assigned to <br />Orono will be made. Upon adoption of all those items, the City <br />will then be in a position to consider requests for rezoning for <br />properties in the corridor.
The URL can be used to link to this page
Your browser does not support the video tag.