My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-17-2025 - Agenda Packet Planning Commission - PC Packet
Orono
>
Planning Commission
>
2025
>
03-17-2025 - Agenda Packet Planning Commission - PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:21 AM
Creation date
3/18/2025 9:25:39 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
PC Packet
Document Date
3/17/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: 12/12/2024 <br />Date Application Considered as Complete: 01/09/2025 <br />120-Day Review Period Expires: 05/09/2025 <br />To:Chris Bollis and Planning Commission Members <br />Adam Edwards, City Administrator <br />From:Laura Oakden, Community Development Director <br />Date:March 17, 2025 <br />Subject:LA24-000054, Rob Page, 430 Old Crystal Bay Road North, <br />Conditional Use Permit, Preliminary Plat, and Site Plan Review <br />Review #2 <br />Background - Review <br />The Applicant requested approval for a new Garage Condo business development on the subject property. <br />The proposed Garage Condo development will access off of the new Orono Industrial Boulevard on the <br />north side of the parcel. There are residential properties to the west of the site across Old Crystal Bay Road <br />North and other industrially-zoned properties directly to the north and east of the property. <br />The applicant submitted a narrative describing the proposed 85 unit Garage Condo development. The units <br />will be sized between 750-1450 square feet for garage storage. The project is proposed as a condominium <br />format with the Developer/HOA owning the land and the units will be individually-owned for the personal <br />use of each owner. Each unit is designed to have utility connections for water and sewer and can be <br />customized to include additional amenities such as bathrooms, kitchens, and/or washers/dryers. The <br />common spaces on the property will be managed by an association which will provide for general <br />maintenance and stormwater drainage of the site determined by the applicant. The development will not <br />have a customer-facing/retail. <br />The applicant noted that the development would not have employees, but they may utilize a space for unit <br />sales while under construction. The applicant also notes the site will operate with estimated business <br />hours between 6 am-10 pm seven days a week. The site will be secured with a fence and gate. <br />The Planning Commission reviewed the applicant’s request at the February 18, 2025 Planning Commission <br />meeting where a public hearing was held. Two letters from the public were submitted for review; there <br />were no public comments during the meeting. The Commission discussed the proposal and requested <br />additional information about the use of the site, maneuverability plan, parking plan, timeline, and <br />construction phasing. The project was ultimately tabled and the Commission directed the applicant to <br />provide updated information addressing several issues. <br />The applicant provided updated or additional information for review at the March Planning Commission <br />meeting, including photos of other garage condos in the Twin Cities area for comparison, construction <br />plans, civil plans, renderings and a traffic study for the site. <br />1. Planning Commission requested more detail regarding the proposed Covenants. The developer <br />provided updated Covenants/revised Declaration language, attached as Exhibit specifying the <br />following (the developer’s responses are in italics): <br />Application Summary: The applicant is requesting a Conditional Use Permit, Preliminary Plat <br />approval, and Site Plan approval for an eighty-five (85) unit Garage Condo development. <br />Staff Recommendation: Planning Department Staff recommends approval. <br />100
The URL can be used to link to this page
Your browser does not support the video tag.