My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-09-1989 Council Packet
Orono
>
City Council
>
1989
>
01-09-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 10:23:04 AM
Creation date
3/10/2025 10:20:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
550
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'V <br />SEC. 10 .SPECIAL REQUIREMENTS FOR REZONING IN THE <br />HIGHWAY 12 CORRIDOR STUDY AREA. <br />A.Minimum Area <br />To insure consistency with the goals and objectives of the <br />Highway 12 Corridor Study, applications for rezoning <br />within the study area must include a minimum of five <br />acres. The plans submitted along with these applications <br />must also include enough information regarding the effect <br />of the proposed development on surrounding parcels to <br />insure that the property can be developed in a manner that <br />is both compatible with adjacent properties and consistent <br />with the Highway 12 Corridor Study. <br />B.Access and Circulation Plan <br />The plans submitted along with the application must <br />propose access to the proposed development which is <br />consistent with the Transportation Planning Objectives of <br />the Highway 12 Corridor Study. All public easements and <br />road right of way that is needed to allow the construction <br />of service roads and/or the expansion of Trunk Highway 12 <br />past the subject property, shall be dedicated to the <br />City. <br />C. Sanitary Sewer Availability <br />The availedjle sanitary sewer capacity to serve the <br />development of this corridor is currently very limited. <br />Therefore, any plans to develop within this area must <br />either demonstrate that it can occur utilizing current <br />sewer allocations or they must include improvements to <br />increase the capacity of the systems serving this area. <br />If sanitary sewer system improvements are proposed as cart <br />of the application, then the feasibility of providing this <br />service will also be scrutinized along with an improvement <br />financing plan to insure that the costs associated with <br />providing this additional capacity will be paid for by the <br />development. <br />D. Storm Water Management <br />Site Drainage plans must be submitted to insure <br />consistency with the storm water management objectives of <br />the Highway 12 Corridor Study. Plans will be carefully
The URL can be used to link to this page
Your browser does not support the video tag.