My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-09-1989 Council Packet
Orono
>
City Council
>
1989
>
01-09-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 10:23:04 AM
Creation date
3/10/2025 10:20:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
550
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Westonka Area Chamber of Commerce Page 2 <br />30 December, 1988 <br />28 November, 1988 <br />ST. ANTHONY MAIN - PHASE FOUR Robin and Close, 1984 <br />The concepts of festive retailing and the development of the pedstrian <br />environment were important in the design of this riverfront complex. <br />EAST SEVENTH STREETSCAPE, SAINT PAUL Robin and Close, 1985 <br />This design project proposed Streetscape improvements for an area of <br />East Seventh dominated by older industrial and commercial uses. <br />I propose the follwoing outline of services as my minimum recommendation to achieve a <br />conceptual design plan for the Navarre-Spring Park-Mound corridor. <br />A. INFORMATION ASSEMBLY <br />1. Assemble currently available information showing road <br />alignment, right of way, utilities and adjacent areas. <br />2. Photographic inventory of the road and adjacent properties. <br />B. PRELIMINARY DESIGN <br />1. Design input workshop with community representatives. <br />2. Prepare the preliminary plan and design inages. <br />3. Present the preliminary plan. <br />4. Receive comments about the design. <br />C. COMPLETE PRELIMINARY PLAN. <br />1. Incorporate comments to date into the Plan. <br />2. Publish the Plan in traditional 24” x 36” sheet form with <br />freeahnd graphics and images. 10 sheets are required. <br />While your ’’Request for Bids” did not ask for pricing for services, I am prepared to <br />provide the services outlined for a -se of $3,500. I am prepared to start work on your <br />projt immediately following your signing this proposal, which will serve as our <br />agreement, and receipt of a 25% retainer. I will devote my full attention to the <br />completion of the work by February 15, 1989 as you have requested. I will personally <br />perform all the tasks for your project as is my normal manner of work. This work is a <br />professional service and as such will not provide materiaTs or labor for installation <br />on the site. I recommend that implementation of the project follo’-^ traditional <br />engineering practices of competetive bidding based on a published, refined plan and <br />specifications. <br />Thank you for the opportunity to present ray qualifications and proposal; I feel that I <br />am well qualified for the work and I look forward to working with you. <br />Accepted <br />Westonka Area Chamber of Commerce
The URL can be used to link to this page
Your browser does not support the video tag.