My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-09-1989 Council Packet
Orono
>
City Council
>
1989
>
01-09-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 10:23:04 AM
Creation date
3/10/2025 10:20:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
550
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Jamesrobin <br />landscape architect 2 3 4 2 0 <br />park street excelsior, <br />mlnnesota 8 8 3 3 1 <br />eia/474-3946 <br />30 December, 1988 <br />28 November, 1988 <br />Westonka Area Chamber of Commerce <br />5600 Lynwood Boulevard <br />Mound, Minnesota <br />55364 <br />re: Beautification Project <br />i <br />Dear Committee Members: <br />I am interested in providing design services for the Count Road 15 Beautification <br />Project as described in "Request for Bids" dated 9 November, 1988. <br />I am a registered Landscape Architect and have been in private practice at my present <br />location for 16 years. My project work has included large residences, housing <br />projects, public park work, government buildings and commercial sites as shown on the <br />acompanying Resume'. I have been involved in several roadway and streetscape design <br />projects as described below and shown by the selected photos and drawings which also <br />follow. <br />MINNEAPOLIS PARKWAY RECONSTRUCTION Interdesign Inc, 1972 <br />I was the designer responsible for preliminary concepts for this <br />project including road and path alignment, parking bays, curb and <br />roadway detail, lighting layout and planting masses. <br />BURNSVILLE CENTER Bailey and Associates, 1973 <br />My responsibility was for landscape design concepts and preparation <br />of sketch images to describe the proposals. <br />CHOWENS CORNER REDEVELOPMENT. DEEPHAVEN James Robin, 1980 <br />I developed the overall site design for this p 'oject including roadway <br />parking and walk alignments and planting concepts. <br />HUTCHINSON DOWNTOWN AREA DESIGN WORKBOOK Robin and Close. 1982 <br />Working for the Hutchinson Chamber of Commerce, the downtown area <br />was reviewed f;.r problems and potential using visual images to suggest <br />a range of possible improvements. <br />FDRT ROAD STR TTSCAPE, SAINT PAUL Robin and Close, 1982-4 <br />This pri ct produced streetscape improvements worth $1.2 million for <br />the area ousinesses along 5 miles of West Seventh Street. Improvements <br />included new walks, street trees, pedestrian lighting, storefront <br />awnings and ornamental metal grilles. The clients were the West <br />Seventh Street Federation and the City of Saint Paul Department of <br />Flam ing and Economic Development.
The URL can be used to link to this page
Your browser does not support the video tag.