My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-2025 CC Agenda Packet
Orono
>
City Council
>
2025
>
03-10-2025 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2025 3:48:13 PM
Creation date
3/7/2025 2:04:38 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
AGENDA PACKETS
Section
ADMINISTRATION
Subject
Regular Meeting
Retention Effective Date
3/10/2025
Retention
Permanent After File Date
Protection
Public
Supplemental fields
Code
ADM 00500
Date
3/10/2025
Description
Council Meeting Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
385430 OR -Pump House Well #3 2250 Wayzata Blvd to CH - New Build <br />r& <br />fr <br />AIL <br />Below is the estimated "not to exceed" cost to complete fiber connectivity to Pump house #3 <br />located at 2250 Wayzata Blvd. W. Orono, MN 55356 to Orono City Hall. This estimate includes the <br />cost of the switch/network equipment for the pumphouse. <br />Material cost: $9,600.00 <br />Labor cost: $52,572.50 <br />Switch cost: $5,000.00 <br />Total estimated cost: $ 67,172.50 <br />Estimated annual locates $582.00. <br />61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.