My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-1990 Council Packet
Orono
>
City Council
>
1990
>
11-26-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 2:34:53 PM
Creation date
2/21/2025 12:48:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic System Management Program <br />August 24, 1990 <br />Page 16 of 16 <br />5.Installation of municipal sewers remains a high cost <br />alternative with environmental ramifications perceived by <br />the City to be more detrimental than those associated with <br />septic systems. Therefore, it is in the City's best <br />interest to make the strongest effort possible towards the <br />successful long-term use of septic systems. <br />j <br />Recommendation <br />Based on the above conclusions, staff recommends that a <br />septic system program manager be hired, to provide a <br />comprehensive direction and oversight of all phases of septic <br />system design, location, construction, use and maintenance. This <br />position would be responsible for all facets of the program, <br />including subdivision septic review, new system plan review and <br />approval, inspection of new system construction, inspection of <br />existing systems, followup on all necessary repair work, updating <br />of codes as necessary, and public education regarding septic <br />systems. This would be intended as a full time permanent <br />position within the Building & Zoning Department. <br />o
The URL can be used to link to this page
Your browser does not support the video tag.