My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-18-2025 Planning Commission Packet
Orono
>
Planning Commission
>
2025
>
02-18-2025 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 12:29:39 PM
Creation date
2/20/2025 12:21:46 PM
Metadata
Fields
Template:
x Minutes and Agendas
Minutes or Agenda
Agenda
Meeting Date
2/18/2025
Board
Planning Commission
Jump to thumbnail
< previous set
next set >
Attachment
ID:
1
Attachment:
Orono Garage Condos_PrelimPlan.pdf
(320KB)
ID:
2
Attachment:
RE Garage Condo- Incomplete Notice.msg
(178KB)
ID:
3
Attachment:
Industrial Blvd Road Plans 9.16.24.pdf
(295KB)
Text box
ID:
1
Creator:
Katie Fitzsimmons
Created:
2/20/2025 12:21 PM
Modified:
2/20/2025 10:05 AM
Text:
mailto:loakden@oronomn.gov
ID:
2
Creator:
Katie Fitzsimmons
Created:
2/20/2025 12:21 PM
Modified:
2/20/2025 10:05 AM
Text:
mailto:robertlouis.page@gmail.com
ID:
3
Creator:
Katie Fitzsimmons
Created:
2/20/2025 12:21 PM
Modified:
2/20/2025 10:05 AM
Text:
mailto:dbramsay@gmail.com
ID:
4
Creator:
Katie Fitzsimmons
Created:
2/20/2025 12:21 PM
Modified:
2/20/2025 10:05 AM
Text:
mailto:ross.hedlund@tradition-cre.com
ID:
5
Creator:
Katie Fitzsimmons
Created:
2/20/2025 12:21 PM
Modified:
2/20/2025 10:05 AM
Text:
mailto:markg@gronbergassoc.com
ID:
6
Creator:
Katie Fitzsimmons
Created:
2/20/2025 12:21 PM
Modified:
2/20/2025 10:05 AM
Text:
mailto:ed@chaninlaw.com
ID:
7
Creator:
Katie Fitzsimmons
Created:
2/20/2025 12:21 PM
Modified:
2/20/2025 10:05 AM
Text:
file:////c/www.oronomn.gov
ID:
8
Creator:
Katie Fitzsimmons
Created:
2/20/2025 12:21 PM
Modified:
2/20/2025 10:05 AM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From:Laura Oakden <br />To:"Rob Page" <br />Cc:David Ramsay; Ross Hedlund; Mark Gronberg; Edwin Chanin <br />Subject:RE: Planning Commission Cancelled <br />Date:Monday, February 3, 2025 4:58:06 PM <br />Attachments:Orono Garage Condos_PrelimPlan.pdf <br />RE Garage Condo- Incomplete Notice.msg <br />Industrial Blvd Road Plans 9.16.24.pdf <br />Hi Rob, <br /> <br />I have received the following comments for you to consider: <br />1. Stormwater plan. I believe the stormwater comments provided in Engineering Review #1 <br />have not yet been addressed (Sent to you on 12.23.24). No hydraulic / hydrologic calculations <br />have been provided to confirm sizing of the proposed on-site basin meets NPDES <br />requirements (or MCWD requirements). I have attached the previous comments for your <br />information, as I believe they are still applicable. Please provide this information. <br />2. Fire. The Fire Chief noted that the 70’ fire turn around anticipated with the construction of <br />the road (see road plan attached) no longer meets the fire turn around standards due to the <br />gate with the proposed garage condo construction plan. The proposed gate obstructs the <br />turn around. The gate can be removed, moved back, or the property to the north can be used <br />as the turn around, however a new plan should be submitted to ensure the fire code turn <br />around standards are met. <br /> <br />As far as the application timing, I don’t think it would be productive to present the final plat and the <br />preliminary plat concurrently. The new city council has not reviewed or weighed in on your <br />application and will not see it until February 24th at the soonest. In order to process a final plat <br />application, all plans must be finalized and must address the comments brought up by staff, any <br />amendments from the Planning Commission and/or City Council. Final mylars must be approved by <br />the county and submitted to us, required fees must be paid and the development agreement <br />drafted and ready for execution in order for the final plat to be placed on council agenda for <br />consideration. <br /> <br />Regarding permitting, once we are closer to a final plan set, you can apply for the necessary building <br />permits. We will not release the permit until the final plat is approved by the City Council and <br />recorded. There is some staging timing that needs to be considered due to the construction of the <br />road. <br /> <br />Let me know if you have further questions as we work through this project. <br /> <br /> <br />Laura Oakden <br />Community Development Director <br />City of Orono <br />Direct: 952-249-4602 <br />2750 Kelley Parkway, Orono, MN 55356 <br />www.oronomn.gov <br />89
The URL can be used to link to this page
Your browser does not support the video tag.