My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-18-2025 Planning Commission Packet
Orono
>
Planning Commission
>
2025
>
02-18-2025 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 12:29:39 PM
Creation date
2/20/2025 12:21:46 PM
Metadata
Fields
Template:
x Minutes and Agendas
Minutes or Agenda
Agenda
Meeting Date
2/18/2025
Board
Planning Commission
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary Plans <br />Orono Garage Condos <br />Page 2 <br /> <br />H:\ORNO\_Surface Water Management\MS4 Administration\MCM-5\2_Site Plan Reviews\Orono Garage Condos\Orono Garage Condos_PrelimPlan.docx <br /> <br />4. Final Plans should include the following: <br />a. Site Plan <br />b. Grading, Drainage, and Erosion Control Plan <br />c. Utility Plan <br />d. Street Construction Plan <br />e. Landscape and Restoration Plan <br />f. SWPPP meeting NPDES requirements <br />g. City Standard Details <br />5. The applicant will be required to obtain the following permits and provide a copy of any <br />approvals required prior to Final Plat approval: <br />a. MPCA Sanitary Sewer Extension Permit <br />b. MDH Water Main Extension Permit <br />c. Minnehaha Creek Watershed District (MCWD) <br />d. NPDES General Construction Permit <br />6. The applicant will be required to submit a Maintenance Agreement for all stormwater <br />management structures and facilities. The agreement must define maintenance responsibilities <br />following completion of project, specify types and frequencies of inspection and maintenance <br />activities, designate who will conduct inspection and maintenance activities, and outline <br />reporting requirements. The Agreement should be recorded with the County per the City’s <br />approval process. <br />7. Drainage and Utility Easements should be provided as follows: <br />a. Over all stormwater management facilities used to meet regulatory requirements, including <br />access routes. <br />b. All swales, structures, and piping providing drainage for multiple properties. <br />c. 5’ along all side lot lines, unless adjacent to Development boundary. <br />d. 10’ along all front lot lines, rear lot lines, and adjacent to Development boundary. <br />8. Additional comments may be forthcoming once a complete Stormwater Management Plan is <br />provided. <br /> <br />If you have any questions or comments, please contact me to discuss. <br /> <br />Sincerely, <br />Bolton & Menk, Inc. <br /> <br />Robert E. Bean, Jr., P.E. <br />Water Resources Engineer <br /> <br />88
The URL can be used to link to this page
Your browser does not support the video tag.