My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-18-2025 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2020-2029
>
2024
>
02-18-2025 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:05:33 AM
Creation date
2/20/2025 9:48:31 AM
Metadata
Fields
Template:
x Minutes and Agendas
Minutes or Agenda
Agenda
Meeting Date
2/18/2025
Board
Planning Commission
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILE #LA24-000068 <br />February 18, 2025 <br />Page 9 of 10 <br /> <br /> <br />for City sewer and water. After additional discussion with Staff, the developer is considering a <br />water and sewer utility connection for each building to serve each row of garage condo units. <br /> <br />The connection type and number impacts the water and sewer area connection fees. If the <br />plans change to reflect connections for each building rather than each individual unit, an <br />amended utility plan must be submitted. A Sewer Availability Charge (“SAC”) determination by <br />the Metropolitan Council (Met Council) is required in order to calculate the appropriate fees for <br />sewer services. Staff is recommending to use the Met Council’s unit determination to calculate <br />the City’s water and sewer area connection charge due at the time of Final Plat. <br /> <br />At this time, due to the size of the buildings and the number/type of proposed connections it is <br />estimated that the development will require 11 SAC units according to the Met Council. <br />Therefore, City will calculate the water and sewer area charges for 11 units. Each individual <br />condo or suite will need its own water meter. A utility connection permit will be due at the time <br />of building permit issuance for each unit that will be metered as well. <br /> <br />DEVELOPMENT FEE ANALYSIS: <br />Fee Type Breakdown Estimated Total <br />Water Area Connection $4,370.00 x 11 units $48,070.00 <br />Water Connection Permit Fee <br />(Due at time of connection) <br />$150.00 x 85 suites** $12,750.00 + meter costs <br />Sewer Area Connection $6,000.00 x 11 units $66,000.00 <br />Sewer Connection Permit Fee <br />(Due at time of connection) <br />$150.00 x 85 Suites** $12.750.00 + meter costs <br />Sewer Availability Charge “SAC” <br />(Met Council) <br />$2,485.00 x 11 units* $27,335.00** <br />Stormwater Drainage Trunk Fee $9,690.00 x 4.89 acres $47,384.10 <br />ESTIMATED DEVELOPMENT FEES = $ 214,289.10 <br />*A SAC determination is required by the Met Council and may alter this fee. <br /> <br />Public Comment <br />We have received comments from two members of the public which are included in the packet <br />as exhibits. <br /> <br />Issues for Consideration <br />1. Will individual condo owners be permitted to make exterior changes or expansions such <br />as building additions, decks, porches, etc.? The applicant should address how they plan <br />to handle this activity since the individual garage condo owners will not own the land. <br />Although easements will be in place, the land outside the buildings will be common <br />space. <br /> <br />2. Does the Commission find the proposed application meets the Conditional Use and Site <br />Plan standards? <br /> <br />3. Is it reasonable to limit community events, gatherings, or guests on the property? The <br />applicant should address how they plan to address these issues. <br /> <br />4. The applicant submitted elevation plans for the proposed Garage Condos. Does the <br />26
The URL can be used to link to this page
Your browser does not support the video tag.