My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SES25-000001 Final Permit Report
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4725 Bayside Road - 06-117-23-22-0022
>
Permits/Inspections
>
SES25-000001 Final Permit Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 12:41:16 PM
Creation date
2/19/2025 3:04:44 PM
Metadata
Fields
Template:
x Permits
Permit Number
SES25-000001
PID #
0611723220022
Address
4725 Bayside Rd
Permit Type
Solar Energy Systems
Property Type
Residential
Applicant Name
Tollefson, Nathan
Property Owner
Suzanne Stauduhar Mark Stauduhar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENPHASE <br />DATA SHEET <br />IQ7HS Microinverter <br />The high-powered, smart grid -ready IQ7HS Microinverter with integrated MC4 <br />connectors dramatically simplifies installation while achieving the highest system <br />efficiency. <br />rt <br />Part of the Enphase Energy System, the <br />I07HS Microinverters integrate with the <br />IQ Gateway, IQ Battery, and the <br />Enphase Installer App monitoring and <br />analysis software. <br />Connect PV modules quickly and easily <br />to the IQ7HS Microinverters that have <br />integrated MC4 connectors. <br />IQ7HS Microinverters extend the reliability <br />standards set forth by previous generations <br />and undergo over a million hours of power - <br />on testing, enabling Enphase to provide an <br />industry -leading warranty of up to 25 years. <br />I07HS Microinverters are UL Listed <br />as PV rapid shutdown equipment and <br />conform with various regulations when <br />installed according to the manufacturer's <br />instructions. <br />Easy to install <br />Lightweight and simple <br />Faster installation with improved, <br />lighter two -wire cabling <br />Built-in rapid shutdown compliant <br />(NEC 2014, 2017, 2020, and 2023) <br />Productive and reliable <br />Optimized for high powered <br />60-cell/120-half-cut-cell, 66-cell/ <br />132-half-cut-cell, and 72-cell/ <br />144-half-cut-cell PV modules <br />More than a million hours of testing <br />Class II double -insulated enclosure <br />UL Listed <br />Smart grid -ready <br />Complies with advanced grid support, <br />voltage, and frequency ride -through <br />requirements <br />Remotely updates to respond to <br />changing grid requirements <br />Configurable for varying grid profiles <br />Meets CA Rule 21(UL 1741-SA) and <br />IEEE 1547:2018 (UL 1741-SB, 3rd Ed.) for <br />single-phase systems <br />© 2024 Enphase Energy. All rights reserved. Enphase, the a and CC logos, IQ and certain other marks listed at <br />enphase.com/trademark-usage-quidelines are trademarks of Enphase Energy, Inc. in the U.S. and other countries. <br />Data subject to change. <br />DSH-00562-1.0- EN-US-2024-08-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.