My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5585
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 5500 - 5599 (August 28, 2006 -April 7, 2007)
>
Resolution 5585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2015 12:01:37 PM
Creation date
11/5/2015 12:01:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. �, <br /> O� <br /> � <br /> � O >: � . O ' <br /> � CITY of ORONO <br /> -„ ,. _ � <br /> � � <br /> � RESOLUTION OF THE CITY COUNCIL <br /> ti <br /> �L`�kEsKOg'�G No. � 5 8 5 . <br /> c) proposed floor plan; . <br /> d) building dimensions; and <br /> � . e) the location of trash and recycling containers and of <br /> heating, ventilation and air conditioning equipment. . <br /> 5} Parking lot construction plans, including confirmation that parking <br /> lots and driving lanes will be paved and provided with concrete <br /> curb and gutter, and that all driving lanes within parking lots shall <br /> have a 9-ton minimum pavement section. A geotechnical <br /> evaluation of the soil shall be done in conjunction with the <br /> � � pavement design and shall be submitted to the City Engineer for <br /> � approval. <br /> 6) Detailed signage plan mcluding monuments signage and wall <br /> mounted signage. <br /> 7) Lighting plan including pole and building motuited lighting. <br /> 8) Any additional plans and specifications deemed necessary by the <br /> City as review progresses. <br /> C. Development Agreement. Developmeilt Approval is contingent upon the <br /> successful execution of a Development Agreement between the applicant <br /> and the City. Such Agreement shall address all specific City requirements <br /> for the development. <br /> D. Financial Guarantee. T�e Development Agreement shall include a <br /> financial guarantee by the applicant to ensure the completion of site <br /> improvements. The City Engineer shall complete an estimate of <br /> improvement costs, including but not limited to landscaping, gradin�; <br /> erosion control, utilities, driveways and parking areas, trails, sidewalks, <br /> retaining walls and stormwater mana�ement facility construction, and the <br /> applicant shall rrovide ta tl�e Gity a financial ;uarantee of 150% of the <br /> improvement costs. <br /> . ' <br /> Pa�e 9 of 1? <br />
The URL can be used to link to this page
Your browser does not support the video tag.