My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-08-1990 Council Packet
Orono
>
City Council
>
1990
>
10-08-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2025 2:40:27 PM
Creation date
2/3/2025 2:38:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File 1585 September 12 <br />Page 2 <br />wall. The engineer's letter. Exhibit G, confirms that 8 cabled <br />anchors installed within the adjacent bank will provide <br />protection from overturn (shoreline side washed away reducing <br />wall imbediment). It is the engineer's opiniion that "the <br />seawall will structurally withstand the earth's pressures and <br />environmental elements for the expected life of the wall <br />materials themselves". <br />Staff has worked with Mr. Carlson in the past in seeking <br />special approval for construction of the dock within the channel <br />area. All residents within this subdivision whose properties <br />abutt the channel area are reauired to seek special approval from <br />the Council for the issuanc Df building permits for docks. Mr <br />Carlson has been a resident our City for over 6 years. It may <br />be appropriate for members to ask the applicant to respond as to <br />the circumstances surrounding the installation of the dock <br />without the benefit of permit review. <br />Options of Action <br />A. Denial - If d>:nied, please refer to the necessary findings <br />set forth in Section 10.09, Subdivision 6 (A). Please note <br />that the seawall does not require a variance approval as <br />this is an accepted or permitted structure below the 929.4 <br />elevation of the lake. <br />B. Approval - If approved please refer to the same section for <br />the necessary findings. An approval recommendation should <br />include the following conditions; <br />1. <br />2. <br />Applicant to obtain required building permit, <br />fee will be required. <br />Penalty <br />Applicant is placed on notice that any repair of the <br />existing seawall will require a separate conditional <br />use permit review.
The URL can be used to link to this page
Your browser does not support the video tag.