Laserfiche WebLink
File #2341 <br />February 12, 1998 <br />Pages <br />Septic Testing and Site Availability <br />Steve Weckman ha^ contirmed ihat all lots have viable primar>' and alternate sites, and that future <br />testing would he t. - .ded io confirm whether less costly trench systems can be used on certain sites <br />where mounds are now acceptable. <br />Bluff Impacts <br />Lots 5 and 6 contain a bluff, and the 'top of bluff was defined by staff during the sketch plan review. <br />A 30' setback f . n top of bluff ‘ j required for any structures, and fill or excavated material is not <br />allowed to be placed within the bluff impact zone. <br />The top of bluff as depicted in the preliminary plat for Lot 5 does not match the top of bluff location <br />identified by staff, and top of bluff actually is ver>^ near the proposed house location on Lot 5. Lot <br />5 has a very restrictive building site due to the street setback and top of bluff setback requirements. <br />A more thorough analysis of the allowable building site should be considered for Lot 5, since that <br />lot appears to be the least flexible of the lots in regards to house placement. <br />T e and Woodland Impar' oposed <br />Tree lines and wooded area ? on the topographic backci ound map (See Exhibit I of Sketch <br />Plan memo). Most of the woov. a t^eas are near the shoreline or along the west property boundary. <br />The dense woods along the shoreline will be under tremendous pressure. We could expect that <br />individual homeowners will want to establish views of the lake irom their new homes, by thinning <br />the woods or creating open corridors to the lake. Such cha.»j;,:s in the nature of the shoreline <br />landscape would be unfortunate in the context of this virtually untouched arm of Ma.xwell Bay. <br />The tree preservation ordinances currently in place would disallow cutting any 6" or larger diameter <br />tree within 75' of the shoreline, and prohibit 'intensive vegetation clearing' within 7.5' of the <br />shoreline, on steep slopes and in the bluff impact zone. <br />During the sketch plan review. Planning Commission agreed tL ould be appropriate to require <br />that some type of 'tree conservation easement' be specifically developed for this site. This would <br />appear to be possible under the provisions of Section 11.60, Subd. 1. The develojxjr should also be <br />required to plant boulevard trees along all roads per the subdivision code requirements. <br />Issues for Discussion <br />1. Will Planning Commission accept the two cul-de-sac lots which require width variant