My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-23-1998 Council Packet
Orono
>
City Council
>
1998
>
11-23-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 10:31:07 AM
Creation date
1/7/2025 10:19:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
594
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR AUGUST 17,1998 <br />(#2403 TERRY CLARK, Continued) <br />to approve an addition in the 0-75' setback. <br />Chair Smith stated the impact to the lake and bluff areas are both high priorities of the Planning <br />Commission, and suggested the Applicant look at reducing and moving the addition to lessen the <br />impact on the 0-75* setback. <br />Stoddard stated he agreed with Chair Smith. <br />The Applicant’s contractor stated that what the Applicant was proposing was reasonable, noting the <br />current residence has no basement. <br />Chair Smith stated this was a very special property, and recommended tabling the matter to allow the <br />Applicant time to submit revised plans. <br />Stoddard commented it probably wouldn't pass as currently proposed. <br />The App''cant's contractor requested the matter be tabled. <br />Smith moved, Stoddard seconded, to table Application #2403,1575 Long Lake Boulevard, <br />to allow the Applicant time to submit revised plans. VOiE: Ayes 5, Nays 0. <br />(#11) 2404 OTTEN BROTHERS NURSERY, 2350 WEST WAYZATA BOULEVARD - <br />COMMERCIAL SITE PLAN REVIEW/VARIANCES, 9:07 p.m. - 9:33 p.m. <br />The Certificate of Mailing and Affida' t of Publication were noted. <br />Rod Johnson, representative of Often Brothers, was present. <br />Gaffron stated the Applicant is requesting approval of a commercial site plan for construction of a <br />132' X 144' greenhouse addition at the east end of the main building and will be utilized for virtually <br />the same retail sales function as currently exists in the main building but will provide for a more <br />controlled environment. Gaffron commented there currently is no standard in the B-6 zoning district <br />for structural coverage. <br />(Charles Schroeder returns at 9:12 p.m.). <br />Gaffron stated the proposed greenhouse addition meets the height and setback requirements, and will <br />have low impact to drainage. This addition will not require additional parking or signage and the <br />proposed design of the greenhouse is compatible with the existing structure. <br />Gaffron stated a retaining wall was erected to serve as a loading dock in Outlet C. and cited concerns <br />this retaining wall/loading dock would have on the neighboring residential properly. City Staff <br />recommends that the retaining wall/loading dock be moved back. <br />Gaffron staled the present zoning code requires that any change to the approved final PUD <br />development plan be processed as an amendment of the final development plan followed by a <br />resolution that amends the conditions of the PUD agreement. <br />Gaffron remarked Staff has received a letter from an adjoining property owner who has expressed <br />concerns about the current landscaping at the rear of the property. Currently there is a berm located <br />Page 13
The URL can be used to link to this page
Your browser does not support the video tag.