My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 1127
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 1100 - 1199 (January 15, 1980 - September 15, 1980)
>
Resolution 1127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2015 12:52:30 PM
Creation date
11/4/2015 12:52:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�ESOLUTION #1127 <br /> A RESOLUTION APPROVING THE RECOPISTRUCTION OF THE <br /> ARCOLA BRIDGE <br /> WHEREAS, the Hennepin Count_y Department of Transportation <br /> constructed the Arcola Bridge, #275-10 Federal Aid System #5-6314-3, <br /> during the summer of 1962 using construction materials and techniques <br /> that were consistent with construction standards at that time for the <br /> bridge, and <br /> WHEREAS, the construction materials and techniques <br /> utilized in the construction of the Arcola Bridge have proven <br /> inadequate to withstand the P�Iinnesota climatic conditions requiring <br /> the extensive use of salt and other chemicals, which has resulted <br /> in premature deterioration of the bridge deck, as well as the <br /> exterior surfaces of the bridge piers, and <br /> WHEREAS, the deterioration of the Arcola Bridge is now <br /> accelerating thus requiring the replacement of the entire bridge <br /> deck as well as repairs to the exterior surfaces of the bridge <br /> piers , and <br /> 44HEREAS, the Hennepin County Department of Trans�ortation <br /> has proposed reconstruction of the Arcola Bridge deck and piers <br /> during the 1980 construction season using Federal funds available <br /> for such bridge replacement, and repairs, and <br /> WHEREAS, the Hennepin County Department of Transportation <br /> has prepared plans and specifications for the letting of contracts <br /> for the reconstruction of the Arcola Bridge, and <br /> WHEREAS, it has. been determined that if the �rcola Bridge <br /> is closed during the reconstruction a detour would cost the general <br /> public $267, 750 in additional energy consumption, and <br /> WHEREAS, the Cities of Orono and Minnetonka Beach have <br /> determined that the closing of the Arcola Bridge to all vehicle <br /> traffic during the reconstruction period would constitute a public <br /> safety hazard because of the increased response time for police, <br /> fire and ambulance service. <br /> NOW, THEREFORE, BE IT RESOLVED that the City Council of <br /> the City of Orono does hereby approve the reconstruction of the <br /> Arcola Bridge subject to the following conditions: <br /> 1) That the reconstruction of the Arcola Bridge be <br /> delayed until such time as Federal funds can be <br /> used for such reconstruction project. <br /> ,,..- <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.