My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7542 Preliminary Plat 2300 6th Ave N
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Resolution 7542 Preliminary Plat 2300 6th Ave N
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 3:45:35 PM
Creation date
12/10/2024 3:45:34 PM
Metadata
Fields
Template:
Address
House Number
2300
Street Name
6th
Street Type
Ave
Street Direction
North
Document Type
Resolutions
Permit Number
LA24-000040
PIN
2711823320002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ot�OkESHO� CITY OF ORONO <br /> RESOLUTION OF THE NO. 7542 CITY COUNCIL <br /> < ICI <br /> g <br /> � <br /> stormwater facilities required by the Minnehaha Creek Watershed District; the Drainage Easements <br /> shall be shown on the Plat. <br /> B4.Removals. A demolition permit must be issued and final inspection completed for the shed to be <br /> removed on Lot 1 prior to issuance of the Septic System permit for Lot 1. <br /> B5.Development Fees. *Final fee amounts will be provided at the time of Final Plat. <br /> a. Park Dedication Fee. The subdivision is subject to the standard Park Dedication Fee <br /> requirement. The Park Dedication Fee is outlined in the City's current Fee Schedule and applied , <br /> to each newly created lot on a per lot basis. Park dedication fees are based on Hennepin <br /> County assessed value of the predeveloped land. The Park Fee for Lot 1 will be based on the <br /> current Fee Schedule at the time of Final Plat approval. <br /> b. Stormwater and Drainage Trunk Fee. The development is subject to the Stormwater and <br /> Drainage Trunk Fee, as established in the City's Official Fee Schedule at the time of Final Plat <br /> approval. Currently, based on the 2024 Fee Schedule, the development of a property within a 2- <br /> acre residential zone requires payment of$8,060 per each new lot and as proposed, the <br /> Developer will be subject to payment of a SWDT fee for one new lot or$8060.00. <br /> B6.City Engineer Approval.Approval of the plat is subject to recommendations of City Engineer <br /> Adam Edwards. <br /> B7.Plans and Specifications. The plans and specifications submitted for review and approval by the <br /> City and other appropriate jurisdictions prior to approval of the Final Plat. <br /> B8.Expiration. The Preliminary Plat approval granted by this Resolution shall expire one-year from the <br /> approval date or December 9, 2025. <br /> FINAL SUBMITTALS <br /> The following list of final submittals must be submitted to the Community Development Department at <br /> least four (4) weeks prior to the regularly scheduled Council meeting (on the second and fourth <br /> Mondays of the month). The required submittals are as follows: <br /> C1.Record plat drawings in the form of(1) to-scale digital copy; two (2) mylar copies (one copy for the <br /> City's records and one for filing with Hennepin County); and one (1) copy reduced to 1" = 200'. <br /> Drawing to include: <br /> a. Lot lines platted per preliminary plat survey/drawing by Gronberg &Associates, Inc., dated <br /> October 21, 2024 attached hereto as Exhibit A, except as modified herein. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.