Laserfiche WebLink
DRAFT <br />T.H. 12 CORRIDOR STUDY <br />T.H. 101 . T.H. 25 <br />CITY/STATE GOALS <br />PROJECT ISSUES/CONCERNS <br />A <br />Mn/DQT <br />Goal 1. Accommodate through trips by auto and trucks at a high level of service along T.H. <br />IZ <br />Goal 2 Provide for the safe movement of vehicles along T.H. 11 <br />Goal 3. Enhance the economic vitality of the State of Minnesota. <br />Goal 4. Preserve the quality of the natural environment along T.H. 12. <br />Issues: <br />• obtaining political consensus on preferred corridor <br />availability and source of funding for design and construction <br />characteristics of new roadway (freeway vs. expressway) <br />access to T.H. 12 (t>'pe and spacing) <br />Goal b. Provide a high quality of life for Long Lake residents. <br />Concerns: <br />impacts on local businesses <br />impact on tax base (existing T.I.F. commitments) <br />impacts on the natural environment (lakes, water quality, wetlands) <br />congestion on T.H. 12