My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-27-1990 Council Packet
Orono
>
City Council
>
1990
>
08-27-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2024 12:14:54 PM
Creation date
12/6/2024 12:10:21 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
609
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Navarre Redevelopment Plan Page 4 <br />PUBLIC HEARINGS AND PRESENTATIONS <br />It is anticipated that five (5) presentations before the Planning Commission and City Council may be <br />required in the pursuit of final approval of the planning study. It is also anticipated that at least two <br />public hearings may be required. All additional meetings and revisions will be charged for on a time <br />plus materials basis. <br />PRODUCT TO BE PROVIDED <br />The CONSULTA lNT shall provide the CITY with written and graphic materials in memorandum form <br />as may be required during the review of this project. Beard mounted, color rs.ndered exhibits and slides <br />will be prepared for purposes of public presentations. At the CITY’S option the CONSULTANT will <br />publish a final report printed on high quality paper with two color graphics and bound in one volume. <br />INFORMATION TO BE FURNISHED BY THE CITY <br />The CITY shall be responsible for providing legal, engineering, surveying, and municipal fiscal con <br />sulting services as may be required. The CONSULTANT shall work in close liaison with these e.xperts <br />throughout the course of the project. None of these services will be requested without prior consent <br />from the CITY. <br />The CITY shall be responsible for providing updated information, including legal descriptions, aerial <br />photos, section maps, fiscal data, tomography (if available), and City infrastructure and utility informa <br />tion. <br />COMPLETION TLVIE <br />The work outlined above will begin immediately upon receipt of the executed contract and will be <br />completed as expeditiously as possible with work for STAGE I being completed within 60 days of <br />commencement, unless delayed by reason of une.xpected emergencies, forces beyond the control of the <br />parties, or b'» request of a partv acouiesced in w'litin!: bv the other party. If so delayed for more than <br />ninety (ISO)’days at the request of the CITY, the CONSULTANT reserves the right to renegotiate <br />the contract to account for rising costs before resuming work. <br />DahIjTcn. Shardlow. and Uban. Inc
The URL can be used to link to this page
Your browser does not support the video tag.