Special investigation fee (work started without
<br />obtaining a permit – applies even if no permit is
<br />pulled)
<br />100% of Building permit
<br />fee
<br />Manufactured Home Installation $275.00 plus
<br />State Surcharge and requires a regular building
<br />permit if also doing basement, foundation,
<br />garage or entryway, fees are based on sq. ft.
<br />State Table
<br />$275.00
<br />City Administrator may require an erosion
<br />control escrow for projects disturbing soils. $1,000.00
<br />Valuation based on ICC 2024 Building Valuation
<br />tables
<br />Total Valuation Fee
<br />$1.00 to $500
<br />$501.00 to $2,000.00
<br />$2,001.00 to $25,000.00
<br />$25,001.00 to $50,000.00
<br />$50,001.00 to $100,000.00
<br />$100,001.00 to $500,000.00
<br />$500,001.00 to $1,000,000.00
<br />$1,000,001.00 and up
<br />State Surcharge as required by State.
<br />Demolition
<br />Demolition: Principal structure $100.00
<br />Demolition: Accessory structure/Septic system
<br />(Per unit fee)$50.00
<br />City Engineer may require an erosion control
<br />escrow for projects disturbing soils.
<br />Not to Exceed
<br />$1,000.00
<br />$6,636.65 for the first $1,000,000.00 plus $4.50 for each additional $1,000.00, or fraction
<br />thereof
<br />$28 for the first $500.00 plus $3.70 for each additional $100.00, or fraction thereof, to and
<br />including $2,000.00
<br />$83.50 for the first $2,000.00 plus $16.55 for each additional $1,000.00, or fraction
<br />thereof, to and including $25,000.00
<br />$464.15 for the first $25,000.00 plus $12 for each additional $1,000.00, or fraction
<br />thereof, to and including $50,000.00
<br />$764.15 for the first $50,000.00 plus $8.45 for each additional $1,000.00, or fraction
<br />thereof, to and including $100,000.00
<br />$1,186.64 for the first $100,000.00 plus $6.75 for each additional $1,000.00, or fraction
<br />thereof, to and including $500,000.00
<br />$3,886.65 for the first $500,000.00 plus $5.50 for each additional $1,000.00, or fraction
<br />thereof, to and including $1,000,000.00
<br /> Refunds: 80% of building permit fees on projects not yet started (within 90
<br />days of permit issuance by municipality). No refund on plan review fees,
<br />state surcharge or maintenance permits
<br />$29.50