Laserfiche WebLink
Special investigation fee (work started without <br />obtaining a permit – applies even if no permit is <br />pulled) <br />100% of Building permit <br />fee <br />Manufactured Home Installation $275.00 plus <br />State Surcharge and requires a regular building <br />permit if also doing basement, foundation, <br />garage or entryway, fees are based on sq. ft. <br />State Table <br />$275.00 <br />City Administrator may require an erosion <br />control escrow for projects disturbing soils. $1,000.00 <br />Valuation based on ICC 2024 Building Valuation <br />tables <br />Total Valuation Fee <br />$1.00 to $500 <br />$501.00 to $2,000.00 <br />$2,001.00 to $25,000.00 <br />$25,001.00 to $50,000.00 <br />$50,001.00 to $100,000.00 <br />$100,001.00 to $500,000.00 <br />$500,001.00 to $1,000,000.00 <br />$1,000,001.00 and up <br />State Surcharge as required by State. <br />Demolition <br />Demolition: Principal structure $100.00 <br />Demolition: Accessory structure/Septic system <br />(Per unit fee)$50.00 <br />City Engineer may require an erosion control <br />escrow for projects disturbing soils. <br />Not to Exceed <br />$1,000.00 <br />$6,636.65 for the first $1,000,000.00 plus $4.50 for each additional $1,000.00, or fraction <br />thereof <br />$28 for the first $500.00 plus $3.70 for each additional $100.00, or fraction thereof, to and <br />including $2,000.00 <br />$83.50 for the first $2,000.00 plus $16.55 for each additional $1,000.00, or fraction <br />thereof, to and including $25,000.00 <br />$464.15 for the first $25,000.00 plus $12 for each additional $1,000.00, or fraction <br />thereof, to and including $50,000.00 <br />$764.15 for the first $50,000.00 plus $8.45 for each additional $1,000.00, or fraction <br />thereof, to and including $100,000.00 <br />$1,186.64 for the first $100,000.00 plus $6.75 for each additional $1,000.00, or fraction <br />thereof, to and including $500,000.00 <br />$3,886.65 for the first $500,000.00 plus $5.50 for each additional $1,000.00, or fraction <br />thereof, to and including $1,000,000.00 <br /> Refunds: 80% of building permit fees on projects not yet started (within 90 <br />days of permit issuance by municipality). No refund on plan review fees, <br />state surcharge or maintenance permits <br />$29.50 <br />Page 4 of 18 272