Laserfiche WebLink
Fee Escrow Notes <br />Variance $550.00 $700.00 + Consultant fees <br />1st Extension $75.00 Staff approved <br />2nd and subsequent $200.00 City Council meeting <br />Conditional Use Permit $550.00 $700.00 + Consultant fees <br />CUP amendment $550.00 $700.00 + Consultant fees <br />1st Extension $75.00 Staff approved <br />Interim Use Permit $550.00 $700.00 + Consultant fees <br />Site Plan Review $550.00 $700.00 + Consultant fees <br />Zoning Amendments including map amendments $550.00 $700.00 + Consultant fees <br />Concept Review $550.00 <br />Comprehensive Plan Amendment $550.00 $700.00 + Consultant fees <br />Subdivision <br />Subdivision: Sketch Plan $550.00 <br />Subdivision: Class III Prel Plat $800.00 $5,000.00 + Consultant fees <br />Subdivision: Final Plat $800.00 $2,500.00 + Consultant fees <br />Subdivision: Preliminary plat extension $550.00 <br />Subdivision Exception $150.00 n/a + Consultant fees if Applicable <br />Vacations <br />Vacations: Road and Easement $550.00 $700.00 + Consultant fees <br />Easement Creation $165.00 $700.00 + Consultant fees <br />Appeal of Administrative Decision $165.00 $700.00 + Consultant fees <br />Stairway to Lake $55.00 <br />Structures not requiring a building permit $55.00 Plus Engineering Costs <br />Encroachment Permit/ Agreement $200.00 <br />Tree removal in shore setback $0.00 <br />Signs (Alteration of cabinent or raceway)$55.00 <br />Sign Structure and Entrance Monuments Based on Value Table <br />Vehicle Storage $55.00 78-1577 (C) <br />Land Alteration $100.00 <br />Tent/ Canopy Permits $55.00 <br />*City Administrator may require an erosion <br />control escrow for projects disturbing soils or <br />tree replacement. <br />$1,000.00 Variable depending on project scope, but not <br />to exceed <br />Zoning confirmation letter $55.00 Request for zoning confirmation letter <br />Address Change Request by Owner $55.00 <br />BUILDING CODE ADMINISTRATION: <br />Building Permits Based on Value Table <br />Building permit fees (Building, Plumbing, <br />Mechanical, unless otherwise noted) <br />Based on 2024 <br />Building Valuation Table <br />Plan Review Fee 65% of Building Permit Fee <br />Rereview Plan Fee Up to the cost of the Plan <br />Review Fee Based on <br />Building Offical <br />Recommendation <br />Minimum Fee $29.50 <br />Moved-In Structure (not including foundation, <br />interior remodel, etc.)$275.00 <br />Pre-Move Inspection $165.00 <br />Exhibit B. Buillding, Planning, and Zoning <br />PLANNING, BUILDING, ZONING <br />All fees, unless otherwise noted, are application fees and are non-refundable after staff work has begun on the application. <br />ZONING PERMITS: <br />All after the fact applications are double fees. All applicants are responsible for actual costs incurred by the City by its' consultants in the <br />review of the application. <br />ZONING APPLICATIONS: <br />Page 3 of 18 271