Laserfiche WebLink
Mr. Lyle Oman -3- March 24, 1995 <br /> Ciry of Orono <br /> Mechanical - Greenhouse-Cont. <br /> 7) Furnish and install a sump pump, and basin, this will have a floor drain <br /> attached, the water will be pumped up into the new waste line, and the <br /> vent will be connected to the new floor drain vent line. Kraus-Anderson <br /> will have about 14 sq.ft. of concrete to cut and patch. Kraus-Anderson's <br /> electrical contractor will have to wire standard 110 opening. <br /> Electrical- Greenhouse <br /> 1) Install a 12 circuit, circuit breaker panel in the greenhouse and all <br /> outlets and connections as specified on Rough Brothers quotation. <br /> Lighting in the greenhouse basement five 8' tandem (2) lamp <br /> fluorescent with T8 lamps and electronic ballasts and on first floor <br /> 10 8' tandem (2) lamp fluorescent same as basement, but with shades. <br /> 2) Rework existing panels within the existing mechanical room in the <br /> cotta�e. <br /> 3) Wire gas fired unit heater with line-voltage thermostat and separate <br /> circuit from breaker panel. No. 2 wire sump pump outlet. <br /> 4) Upgrade the 400 amp single phase 120/240 volt service with meter <br /> on the outside and a new 400 amp main circuit breaker, breaker <br /> panelboard. <br /> Electrical- Gara�e <br /> 1) Install new feeder into garage. Furnish and install (5) 8' 2 lamp with <br /> fluorescent fixtures with electronic ballasts and (4) 48" T8 lamps. <br /> A duplex receptacle, 2-3 ways switches, wire for and connect two <br /> unit heaters with line voltage thermostats. <br /> Very truly yours, <br /> KRAUS-ANDER,$ON CONSTRUCTION COMPANY <br /> MIDW�ST DIX��SION <br /> , � <br /> ; % <br /> �a �% /%� <br /> �J . L; <br /> / <br /> ' cott A.�rawford <br /> Project anager <br /> SAG:rh <br />