Mr. Lyle Oman -2- March 24, 1995 <br /> City of Orono <br /> Mechanical - Gara�e <br /> 1) Install a new natural gas line from the existing meter at the south end of <br /> the existing greenhouse to the existing garage. Note: Kraus-Anderson <br /> to remove and replace blacktop driveway as needed. <br /> 2) Furnish and install (2) 75,000 BTU natural gas fired unit heaters, one <br /> in each corner of the garage near the back wall. <br /> The units will be complete with Class B stacks and line voltage <br /> thermostats. <br /> Mechanical - Greenhouse <br /> 1) Install a natural gas line to the (2) Modine propeller unit heaters, which <br /> are furnished and installed by the Rou�h Brothers Company. <br /> 2) Furnish and install (2) new floor drains and connect the new waste line <br /> to existing floor drain, this waste line will extend back into the existing <br /> mechanical room where waste connection will be made. This new line <br /> will have a vent line extended through the greenhouse roof, an opening <br /> in roof should be provided by Rough Brothers Company. Note: There <br /> would be approximately 30 sq. ft. of concrete for Kraus-Anderson to cut <br /> and patch. <br /> 3) Furnish and install (4) frost proof outdoor sillcocks. Two on the west side <br /> and two on the east side of the new greenhouse. No pipe covering on <br /> any water lines. <br /> 4) Install a 1/2" water supply to the Rough Brothers Company furnished <br /> and installed 100 gallon sump tank. This line will be protected with a <br /> R.P.Z. valve. <br /> 5) Furnish and install (6) cold water faucets (Chicago number 998 with <br /> vacuum breakers). Three on the west wall and three on the east wall. <br /> 6) Furnish and install (1) 50,000 BTU natural gas fired unit heater, this <br /> would be necessary to protect the P-trap for the floor drain in the upper <br /> level floor or this would ha�e to have a heating tape on it. There would <br /> be a 4" Class B chimney run up through the new greenhouse, Rough <br /> Brothers would ha�e to provide openin� in the roof of tne greenhouse <br /> for the stack to pass through. We will furnish a line voltage thermostat, <br /> but Kraus-Anderson's electrical contractor will have to do power and <br /> control wirin�. <br />