My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-29-1990 Council Packet
Orono
>
City Council
>
1990
>
05-29-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2024 2:58:10 PM
Creation date
10/29/2024 2:54:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bonestroo <br />RDsene <br />Anderlik & <br />Associates <br />Engineers & Architects <br />Otto G Bon«t>oa PE <br />(tooen W Boiene. P£ <br />JO»(yi C ATKjfrtik PE <br />Picti^ E Tumef PE <br />Jamej C Own. PE <br />Gicnn R Coo*. PE <br />Thomij E Noyw. PE <br />Rooen G ScfHjmcnt. PE <br />Mkwi L Sorv<iu. PE <br />•CMft A Godon. PE <br />RKn«d W Poser. PE <br />Dorv»<J C B u »9»OL PE <br />Jerry A Bourdon. PE <br />Mjrn A KUnwn. PE <br />1M K F«U. PE <br />Mjcnier T Rjutrrunn. PE <br />Booert R P(Hler»e P£ <br />O^vid O Lotiiou. PE <br />Thorru* W l^terwn. PE <br />Mcruer C Lynch. PE <br />J«mes R MjUna P£ <br />Kenneth P Anderjon. PE <br />Mjrt R RORV PE <br />ROOert C RuiM. AIA <br />Thorrui E Angui PE <br />HOM'jrd A Sjnitord. PE <br />Djmer J Edgertoa PE <br />Mn A Se« PE <br />Ph*p J PE <br />MM O \MH. PE <br />Thomis R Andmoa AiA. <br />G*ry P RyUnder. PE <br />KWei B Jenjen PE <br />L Phrifi Gravel Rl PE <br />Chariei A Enckwn <br />Leo M Pawersiy <br />Hartan M Own <br />Sujan M Ebenei C PA <br />March 15, 1990 #1511 iCity of Orono <br />Box 66 <br />Crystal Bay. MN 55323 <br />Attn: Jeanne Mabusth <br />Re; Otten Subdivision <br />File No. 139A9 <br />Dear Jeanne; <br />Enclosed please find a copy of Outlot B on the Otten property where the new <br />well & pumphouse will be constructed. <br />The proposed location of the pumphouse will require a variance for a 45* <br />setback from the east line for the permanent structure. It will also be <br />necessary to obtain a variance for a 40* setback from the east line and a 30* <br />setback from the north line for the pressure tank. The pressure tank will <br />extend outside the building and will remain in place for 10 years or less. <br />We should start the process with the Planning Commission for obtaining the <br />appropriate variances on the pump house. <br />If you have any questions please contact this office. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />Glenn R. Cook <br />GRC;dh <br />cc; John Gerhardson <br />GRC/16 <br />2335 West Highway 36 • St. Paul, Minnesota 55113 • 612-636-4600
The URL can be used to link to this page
Your browser does not support the video tag.