My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-1990 Council Packet
Orono
>
City Council
>
1990
>
04-23-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2024 11:54:57 AM
Creation date
10/22/2024 11:54:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3290.! <br />i ^ <br />TO: <br />FROM: <br />DATE: <br />Mayoc and City Council <br />Hark E. Becnhacdson, City Administrator <br />March 2, 1990 <br />SUBJECT: Engineering Services Review <br />Attachment:A. Engineering Fee Schedule Memo Dated 2/9/90 <br />B. Engineering Fee Memo Dated 12/5/89 <br />C. Engineering Fee Schedule Review Memo na^ed 11/22/89 <br />D. Consultant Review Memo Dated 12/1/89 <br />ISSUE - Initial presentation of issues and alternatives relative <br />to the provision of Engineering services to the City. <br />INTRODUCTION - As indicated in Attachment D the City desires to <br />undertake a service review of the consultant areas in the <br />engineering area on a three year basis. <br />DISCUSSION - The City of Orono has often relied on outside <br />consultants to provide professional staff work to the City, <br />particularily in the areas engineering and legal. <br />To perpetuate a system however, that has existed for a long <br />period of time however does not mean that what was appropriate 20 <br />years ago for Orono is appropriate for today or will be <br />appropriate in 5 years, circumstances may have significantly <br />changed. It is the reason and benefit of such a review. <br />ENGINEERING SERVICES PROVIDED - The services provided by an <br />engineering group fall into two general catagories; <br />A. On going advi_ce - This applies to engineering work <br />that generally does not requite a large project be <br />undertaken. This type of work applies to reviews of <br />land use planning matters, small repairs maintenance <br />reviews of existing capital facilities such as streets, <br />sewer and water. This is the type of work that blends <br />engineering skills and past City history to help <br />determine decisions on these matters. <br />B. Project engineering - This area is for major capital <br />improvements and includes the following items: <br />Feasibility study <br />Design <br />Plans and Specs <br />Construction document preparation <br />Pre-construction work <br />Construction monitoring <br />Bid review and award <br />recommendation <br />Project modification <br />Project inspection <br />V <br />yProject completion and payment ,
The URL can be used to link to this page
Your browser does not support the video tag.