Laserfiche WebLink
■il <br />I <br />B <br />I <br />I <br />I <br />B <br />I <br />I <br />Mtemate II - (Continued) <br />Part B - 8" Force Main and Lift Station <br />Unit Estimated Estimated <br />Item <br />8* DIP force main <br />8" gate valve and box <br />Cast iron fittings <br />Improved pipe foundation <br />Mechanical trench compaction <br />Bituminous patching <br />Erosion control fence <br />Class 5, lOOZ crushed aggregate <br />Clear and grub trees <br />Sod with topsoil <br />Seeding with topsoil and mulch <br />8" air release valve and manhole <br />Lift station <br />Total Estimated Construction Cost <br />+5Z Contingency <br />+ 15Z Legal, Engrng. & Administration <br />+ 8Z Capitalized Interest <br />Total Estimated Cost - <br />Part B - Force Main & Lift Station <br />Unit Price Quantity Cost <br />Lin.ft.$ 16.00 2,640 $ 42,240.00 <br />Each 500.00 1 500.00 <br />Lbs.2.00 1,500 3,000.00 <br />Lin.ft.2.00 1,000 2,000.00 <br />Lin.ft.1.00 2,640 2,640.00 <br />Sq.yds.8.00 100 800.00 <br />Lin.ft.3.00 500 1,500.00 <br />Ton 10.00 75 750.00 <br />LUMP SUM 750.00 LS 750.00 <br />Sq.yds.2.00 2,000 4,000.00 <br />Acre 2,500.00 1.0 2,500.00 <br />Each 5,000.00 1 5,000.00 <br />LUMP SUM 65,000.00 LS 65.000.00 <br />$130,680.00 <br />_ _6,535.00 <br />$137,215.00 <br />20.580.00 <br />$157,795.00 <br />12.625.00 <br />$170,420.00 <br />I <br />B <br />-12- <br />13952R