Laserfiche WebLink
■ <br />Alternate II <br />8* Force Main to Watertown Road <br />Gravit> Sewei Watertown Road t Metro Station <br />Lift Station at Railroad Tracks <br />Part A - Gravity Sewer (Point C to Point E) <br />4- 15Z Legal, Engmg. fc Administration <br />4- 8Z Capitalized Interest <br />Total Estimated Co<it - <br />Part A - Gravity Sewer <br />-11- <br />13952R <br />Item Unit <br />Unit <br />Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />10* sanitary sewer 0-8' deep Lin.ft.$ 14.00 •i60 $ 13,440.00 <br />10* sanitary sewer 8-10* deep Lin.ft.15.00 755 11,325.00 <br />1.0* sanitary sewer 10-12' deep Lin.ft.17.00 420 7,140.00 <br />10* sanitary sewer 12-14' deep Lin.ft.20. CO 670 13,400.00 <br />10* sanitary sewer 14-16' deep Lin.ft.24.00 30 720,00 <br />10* sanitary sever 16-18' deep Lin.ft.28.00 10 280.00 <br />Standard manhole Each 1,000.00 10 10,000.00 <br />Manhole over depth Lin.ft.100.00 26 2,600.00 <br />Cut into existing manhole Each 300.00 2 600.00 <br />Improved pipe foundation Lin.ft.2.00 3,000 6,000.00 <br />Mechanical trench compaction Lin.ft.1.00 2,845 2,845.00 <br />Clear and grub trees LUMP SUM 5,000.00 LS 5,000.00 <br />Seeding with topsoil and mulch <br />Total Estimated <br />4*5Z Contingency <br />Acre 2.500.00 3.0 7.500.00 <br />Construction Cost $ 80,850.00 <br />4.040.00 <br />$ 84,890.00 <br />12.735.00 <br />$ 97,625.00 <br />7.810.00 <br />$105,435.00 <br />—.■;r.-rT-r.rrr r,—