Laserfiche WebLink
■ <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />m <br />PROJECT COST AND FUNDING <br />The project cost and funding alternatives are outlined In this section <br />vith a detailed cost estimate provided in the appendix. The indicated project <br />costs are as projected for the 1990 Construction Season (ENR 4650). <br />Three alternates are sununarized below for providing the sanitary sewer <br />trunk facilities. <br />Alternate I (Point A to Point E) <br />Part A - Sanitary Sewer Gravity Line (Pt C to Pt E) $ 105,435.00 <br />Part B - Force Main and Lift Station (Pt A to Pt C) 475,865.00 <br />Total Alternate I $ 581,300.00 <br />Alternate II (Point A to Point E) <br />Part A - Sanitary Sewer Gravity Line (Pt C to Pt E) $ 105,435.00 <br />Part B - Force Main and Lift Station (Pt B to Pt C) 170,420.00 <br />Part C - Sanitary Sewer Gravity Line (Pt A to Pt B) 502,860.00 <br />Total Alternate II $ 778,715.00 <br />Alternate III (Point A to Point E) <br />Part A - Sanitary Sewer Gravity Line (Pt C to Pt E) $ 105,435.00 <br />Part B - Force Main and Lift Station (Pt A to Pt C) 539,565.00, <br />Total Alternate III $ 645,000.00 <br />The City reviewed the cost of upgrading or constructing a parallel <br />sanitary sewer trunk line to the Long Lake Metro Lift Station in 1989. The <br />trunk line would provide capacity for the Trunk Highway 12 service area. The <br />following is a summary of the Estimated Project Costs from that report. <br />-6 - <br />13952R