Laserfiche WebLink
I <br />I <br />I <br />I <br />L <br />I <br />C <br />D <br />I! <br />I <br />I <br />I <br />I <br />I <br />f <br />I <br />I <br />1 <br />INTRODUCTION <br />The City of Otono has requested this report to determine the feasibiiity <br />of constructing a sanitary seeer force main along Old Crystal Bay Road. The <br />construction of a lift station near the intersection of Old Crystal Bay Road <br />and the Burlington Northern Railroad would also be a necessary part of the <br />project. The force main would discharge into the Otono Metro lift station <br />near County Road 84. <br />The city reviewed the extension of a sanitary sewer trunk line to the Long <br />Lake Metro lift station in a previous study. The alignment of the trunk line <br />and the updated cost estimate is provided at the back of this report (Figure <br />2). The trunk line to the Long Lake Metro Lift Station would require revision <br />of the existing sanitary sewe agreement between Long Lake Median and Orono. <br />This report review additional options for providing a Sanitary Sewer Trunk <br />to the Highway 12 service area. The alternates for constructing the sewer <br />line along Old Crystal Bay Road wou’d allow the City of Orono to provide <br />service without changing the existing sanitary sewer agreement between the <br />three cities. <br />-3 - <br />13952R