My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-09-1990 Council Packet
Orono
>
City Council
>
1990
>
04-09-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 2:20:56 PM
Creation date
10/18/2024 2:18:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Because of the nature of the area any feasibility study is <br />recommended to include the necessary soil borings along the route <br />to insure accurate cost. The cost of soil borings is <br />approximately $1,500 and it is recommended that 15 test borings <br />be taken. The overall cost of the feasibility study is expected <br />to be $6,000. <br />Staff has preliminarily discussed the issue of a linkage between <br />Highway 12 and the Orono pump station with Metro Waste Control. <br />They have indicated that this would be a more preferable <br />direction for them and see no reason why it would not be approved <br />but feel that the necessary process has to be undertaken in order <br />to authorize it. They havew indicated that it would be <br />considered a minor amendment and that it would have a very <br />limited review. <br />It should be noted that given the City’s existing capacity in the <br />line going east together with this capacity to the south the City <br />would be able to provide itself with more flexibility going in <br />either direction. <br />If this were to be initiated at this point, the Comprehensive <br />Plan amendment would be placed on the Planning Commission agenda <br />for their review and comment and could be acted on by the Council <br />after that. <br />ALTERNATIVES - <br />Issue #1 - Feasibility Study <br />a. Authorize a feasibility study be undertaken. <br />b. Await necessary processing of Comprehensive Plan amendment. <br />c. Table for further discussion. <br />d. Direct the utilization of the Metro Waste pumping station <br />located near Orono Orchard Road, <br />issue #2 - Comprehensive Plan Amendment <br />a, initiate
The URL can be used to link to this page
Your browser does not support the video tag.