Laserfiche WebLink
4690.1 <br />TO: Mayoc and City Council <br />FROM: Mark E. Betnhardson, City Administrator <br />DATE: April 6, 1990 <br />SUBJECT: Highway 12 Sewer and Water System <br />Attachment: A. Highway 12 Sewer and Water Memo Dated 1/19/90 <br />ISSUE - <br />1. Det'^tmine, based on the feasibility study whether the City <br />should further pursue the process for the trunk line serving <br />Highway 12 to be located along Old Crystal Bay Road. <br />2. Determine, if a this point the City should go ahead with <br />ording plans and specifications on this project. <br />INTRODUCTION - Back in January permission was given to do a <br />â– feasibility study along Old Crystal Bay Road to the Orono plant <br />to serve the Highway 12 area. Attachment B is that feasibility <br />report and outlines the options available in developing the <br />system. <br />DISCUSSION - The range of alternatives are presented as follows: <br />Alternative <br />Number <br />Alternative <br />Description <br />Original <br />Estimate <br />Feasibility <br />Estimate <br />8" force main $550,000 $581,300 <br />to Orouo lift <br />station <br />500 Units <br />(Plus 116 in <br />current Orono/ <br />Long Lake/Medina <br />Total Cost Deleting <br />Partial Replacement <br />(An 8" Section that <br />May Not Need To Be <br />Replaced For 10-15 <br />Years <br />$538,490 <br />8" force main <br />to Watertown <br />$778,715 $735,905 <br />15" gravity to <br />Orono Plant