Laserfiche WebLink
4690.1 <br />wOrvj <br />/7 <br />COUMCIL MEETnrG <br />APR 91990 <br />''TVOf OROKO <br />TO: Mayor and City Council <br />FROM: Mark E. Bornhardson, City Adrainistrato^ <br />DATE: April 6, 1990 <br />SUBJECT: Highway 12 Scwf^r and Water System <br />Attachment: A. Highway 12 Sewer and Water Memo Dated 1/19/90 <br />ISSUE - <br />1. Determine, based on the feasibility study whether the City <br />should further pursue the process for the trunk line serving <br />Highway 12 to be located along Old Crystal Bay Road. <br />2. Determine, if a this point the City should go ahead with <br />otding plans and specifications on this project. <br />INTRODUCTION - Back in January permission was given to do a <br />feasibility study along Old Crystal Bay Road to the Orono plant <br />to serve the Highway 12 area. Attachment B is that feasibility <br />report and outlines the options available in developing the <br />system. <br />DISCUSSION - The range of alternative's are presented as follows: <br />Alternative <br />Number <br />Alternative <br />Description <br />Original <br />Estimate <br />Feasibility <br />Estimate <br />8" force main $550,000 $581,300 <br />to Orono lift <br />station <br />(500 Units <br />Plus 116 in <br />current Orono/ <br />Long Lake/Medina; <br />Total Cost Deleting <br />Partial Replacement <br />(An 8" Section that <br />May Not Need To Be <br />Replaced For 10-15 <br />Years <br />$538,490 <br />8" force main <br />to Watertown <br />15" gravity to <br />Orono Plant <br />^500 Units to <br />Watertown Road <br />1100 Units to <br />Orono Plant Plus <br />116 Units in <br />Orono/Long Lake <br />Line ) <br />$778,715 $735,905